SAP C_TS420_1809 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing (1809) |
| Exam Number: | C_TS420_1809 |
| Real Exam Qty: | 80–95 |
| Exam Price: | $518–$560 USD / €470–€510 EUR (varies by region) |
| Available Languages: | English |
| Certificate Validity Period: | 5 years |
| Exam Duration: | 180 minutes |
| Related Certifications: | SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (newer releases) |
| Exam Format: | Multiple choice, Multiple response |
| Passing Score: | 63% |
| Recommended Training: | S4201 - Manufacturing in SAP S/4HANA S4200 - Production Planning in SAP S/4HANA |
| Exam Registration: | SAP Certification Hub SAP Training & Certification Shop |
| Sample Questions: | SAP C_TS420_1809 Sample Questions |
| Exam Way: | Online proctored or at authorized SAP testing centers |
| Pre Condition: | Recommended: Basic knowledge of SAP ERP PP/MM and S/4HANA fundamentals; prior certification C_TSCM42_66/67 is helpful but not mandatory |
| Official Syllabus URL: | https://training.sap.com/certification/c_ts420_1809-sap-certified-application-associate-sap-s4hana-production-planning-and-manufacturing-1809-g/ |
SAP C_TS420_1809 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Advanced Planning & Embedded PP/DS | 12% | - Integration with MRP - Detailed scheduling and capacity planning - Embedded PP/DS overview |
| Topic 2: Integration & Analytics | 6% | - Embedded analytics for manufacturing - Integration with MM, SD, and QM |
| Topic 3: Material Requirements Planning (MRP) | 16% | - Procurement proposals and planning results - MRP parameters and planning run - MRP Live vs classical MRP |
| Topic 4: Capacity Planning & Evaluation | 8% | - Work center load analysis - Capacity leveling and evaluation |
| Topic 5: Production Orders | 16% | - Order creation and structure - Availability check and scheduling - Goods movement and settlement - Order release and confirmation |
| Topic 6: SAP S/4HANA Basics and Simplifications | 8% | - SAP S/4HANA architecture and innovations - Simplification list and scope changes |
| Topic 7: Demand Management & Planning Strategies | 12% | - Demand program and independent requirements - Make-to-stock strategies - Make-to-order strategies |
| Topic 8: Master Data in Production Planning | 12% | - Routings and production versions - Material master and MRP views - Work centers and capacity data - Bill of Materials (BOM) |
SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing (1809) Sample Questions:
Question 1
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Response:
A. Outbound delivery order
B. Warehouse task
C. Outbound delivery request
D. Warehouse order
Question 2
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:
A. Creating a planned order within the planning time fence
B. Assigning a production scheduling profile
C. Manually changing the quantity of a planned order
D. Setting a planning time fence in the Material Master Record
Question 3
In a first step you have created master recipes. In which sequence are the additional objects created?
Please choose the correct answer.
Response:
A. Process order
Control recipe
PI sheet
Process message
B. Process message
Control recipe
Process order
Process message
PI sheet
C. Control recipe
Process order
PI sheet
D. Process order
Control recipe
Process message
PI sheet
Question 4
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.
Response:
A. Routing
B. Bill of Material
C. Engineering Change Record
D. Production Version
Question 5
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
Response:
A. Routing header
B. Material master
C. Work center
D. Bill of material
Solutions:
| Question 1 Answer: C | Question 2 Answer: A,D | Question 3 Answer: A | Question 4 Answer: A,B,D | Question 5 Answer: B,D |
We're so confident of our products that we provide no hassle product exchange.


By Hugh

