Online C_TSCM42_67 Test Brain Dump Question and Test Engine
Real SAP C_TSCM42_67 Exam Dumps with Correct 108 Questions and Answers
SAP PP Certification Exam Details:
| Duration | 180 mins |
| Exam Price | $550 (USD) |
| Number of Questions | 80 |
| Exam Name | SAP Certified Application Associate – Production Planning & Manufacturing with SAP ERP 6.0 EHP7 |
| Reference Books | SCM240,SCM310, SCM300, SCM130, PLM114, TERP50, TERP01,SCM365 |
| Exam Code | C_TSCM42_67 |
| Sample Questions | SAP PP Certification Sample Questions |
| Schedule Exam | SAP Training |
| Passing Score | C_TSCM42_67 - 63% |
| Level | Associate |
NEW QUESTION 40
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
- A. A storage location may be assigned to different MRP areas.
- B. Make-to-order production is supported by storage location MRP areas.
- C. Subcontracting is supported by MRP areas.
- D. An MRP area may include different storage locations.
Answer: C,D
NEW QUESTION 41
What sequence do you follow in master data maintenance to define the production of a material?
- A. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
- B. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
- C. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
- D. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
Answer: A
NEW QUESTION 42
What do you have to consider regarding consumption? (Choose two)
- A. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
- B. Consumption is restructured with the planning run.
- C. Consumption takes place on the material level between the planned independent requirements and the planned orders.
- D. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
Answer: A,D
NEW QUESTION 43
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)
- A. Reducing the order quantity
- B. Rescheduling the operation
- C. Confirming the operation
- D. Posting the goods receipt for the production order
- E. Setting the status technically complete (TECO)
Answer: A,C,E
NEW QUESTION 44
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.
However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)
- A. The delta between the availability dates falls within the tolerance window defined in Customizing.
- B. Requirements planning has not been carried out.
- C. The MRP elements are linked via fixed pegging.
- D. The fixed planned order is outside the rescheduling horizon.
Answer: A,D
NEW QUESTION 45
Which property applies for consumption with planning strategy 40 (planning with final assembly)?
- A. Consumption takes place with the planning material.
- B. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
- C. Consumption can increase the total originally planned production quantity.
- D. Consumption can reduce the total originally planned production quantity.
Answer: C
NEW QUESTION 46
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?
- A. Standard sequence
- B. Parallel sequence
- C. Substitute sequence
- D. Alternative sequence
Answer: D
NEW QUESTION 47
Which function is supported by production orders?
- A. Automatic creation of transfer orders at order release
- B. Automatic selection of a work center at order release
- C. Automatic printing of order documents at order creation
- D. Automatic reading of PP master data at order release
Answer: A
NEW QUESTION 48
Which of the following statements about the SAP Solution Manager listed is correct?
- A. Solution Manager is a stand-alone system that communicates with other systems in a system landscape.
- B. Solution Manager is an add-on industry solution.
- C. Solution Manager is part of the SAP ECC System.
- D. Solution Manager is a satellite system in a system landscape.
Answer: A
NEW QUESTION 49
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
- A. It propagates exception messages from a component to the finished product.
- B. It triggers multilevel bottom-up scheduling.
- C. It posts planning results to the database automatically.
- D. It calculates the delay time which may occur in planning.
Answer: D
NEW QUESTION 50
In your company planning strategies are used in the SAP-ECC demand management that are based on consumption. Which of the following statements about consumption is true?
(Choose two.)
- A. Consumption always takes place on the material level between the planned independent requirements and the planned orders.
- B. Consumption can also take place between order reservations and planned independent requirements, depending on the strategy.
- C. A consumption situation is dynamic and is always restructured with the planning run.
- D. The consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
Answer: B,D
NEW QUESTION 51
What could be a consequence of confirming an operation?
- A. The capacity requirements are updated
- B. The actual costs are settled
- C. The production order is rescheduled
- D. The planned costs are updated
Answer: A
NEW QUESTION 52
You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you want to use a second sequence on other work centers for operations 30 and 40.
Which sequence category do you use to create the second sequence in the system?
- A. Standard sequence
- B. Parallel sequence
- C. Finish-start relationship
- D. Alternative sequence
Answer: D
NEW QUESTION 53
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)
- A. Resource selection
- B. Electronic batch record
- C. Digital signature
- D. Availability check
- E. Approved master recipes
Answer: B,C,E
NEW QUESTION 54
Which of the following scheduling types can only be used in capacity planning?
- A. Forward
- B. Only capacity requirements
- C. Backward
- D. Midpoint
Answer: D
NEW QUESTION 55
During the processing of production orders planned and actual costs are determined.
On which of the following objects can you collect these costs? (Choose two)
- A. Work center
- B. Product cost collector
- C. Planned order
- D. Production order
Answer: B,D
NEW QUESTION 56
The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you recommend? (Choose two.)
- A. Confirmation of the operation that the materials being checked are assigned to
- B. Creation of the production order
- C. Goods receipt for the product produced with the order
- D. Goods receipt for a missing part
- E. Release of the production order
Answer: B,E
NEW QUESTION 57
After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials).
Which of the following planning file entries for this material are set by the system?
- A. The NETCH and NETPL planning indicators
- B. The BOM explosion and the NETPL planning indicator
- C. The BOM explosion, the NETCH, and the NETPL planning indicators
- D. The BOM explosion indicator
Answer: C
NEW QUESTION 58
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)
- A. Reorder point planned materials can be included in LTP.
- B. LTP creates purchase requisitions for external procurement.
- C. LTP focuses on the operational planning of important components.
- D. A planning scenario must be released before it can be used in LTP.
Answer: A,D
NEW QUESTION 59
Which of the following situations occur when a production order is set to Technically Complete (TECO)?
(Choose three.)
- A. Purchase orders for external operations or non-stock materials are deleted.
- B. Capacity requirements are deleted.
- C. The order and its operations receive the system status Locked (LKD).
- D. Reservations are deleted.
- E. The order is no longer relevant for Material Requirements Planning.
Answer: B,D,E
NEW QUESTION 60
You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
- A. Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning -> Capacity planning
- B. Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning -> Capacity planning
- C. Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning -> Material requirements planning
- D. Material requirements planning -> Demand management -> Sales and operations planning -> Long-term planning -> Capacity planning
Answer: B
NEW QUESTION 61
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following properties for the resulting dependent requirements applies?
- A. If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations.
- B. In multi-level backward scheduling, dependent requirements are calculated to the exact second.
- C. When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
- D. In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material.
Answer: D
NEW QUESTION 62
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?
- A. Activate the availability check and assign an overall profile in the production scheduling profile.
- B. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
- C. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.
- D. Assign an appropriate availability checking rule to the material master for the product.
Answer: C
NEW QUESTION 63
Which functions can be triggered before releasing a production order? (Choose three)
- A. Selection of a BOM
- B. Stock determination
- C. Confirmation
- D. Scheduling
- E. Selection of a routing
Answer: A,D,E
NEW QUESTION 64
......
Valid C_TSCM42_67 Test Answers & SAP C_TSCM42_67 Exam PDF: https://www.braindumpquiz.com/C_TSCM42_67-exam-material.html