Released SAP C_TSCM42_67 Updated Questions PDF [Q59-Q80]

Share

Released SAP C_TSCM42_67 Updated Questions PDF

C_TSCM42_67 Dumps and Practice Test (108 Exam Questions)


C_TSCM42_67 Exam Certification Details:

Sample Questions: SAP C_TSCM42_67 Exam Sample Question
Languages:German, English, Japanese
Cut Score:63%
Duration:180 mins
Sub-solution:Product Developmement & Manufacturing
Exam:80 questions
Level:Associate
Component:Production Planning


SAP C_TSCM42_67 Exam Description:

The certification "SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7" verifies the knowledge in the area of Production for the consultant profile. This certificate proves that the candidate has a basic understanding within this consultant profile and can implement this knowledge practically in projects. The SAP Certified Application Associate can contribute to the success of the planning and implementation phases of the project in a mentored role and would typically have a maximum of three years experience in the solution area. Project experience should not be prerequisite for a competent and well trained candidate to pass this exam.


SAP C_TSCM42_67 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Production Orders Advanced (PP-SFC)
Topic 2
  • Production Orders Basics (PP-SFC)
Topic 3
  • Lean Manufacturing (PP-REM| PP-KAB)
Topic 4
  • Material Requirements Planning (PP-MRP)
Topic 5
  • Master Data (LDM)
Topic 6
  • Application Overview and Backgro
Topic 7
  • Material and Capacity Requirements Planning

 

NEW QUESTION 59
Which objects can affect the calculation of capacity requirements for an operation? (Choose three)

  • A. In-house production time (material master)
  • B. Transport time (routing)
  • C. Standard values (routing)
  • D. Formulas (work center)
  • E. Operation control key (routing)

Answer: C,D,E

 

NEW QUESTION 60
Which of the following situations occur when a production order is set to Technically Complete (TECO)?
(Choose three.)

  • A. Purchase orders for external operations or non-stock materials are deleted.
  • B. Capacity requirements are deleted.
  • C. The order and its operations receive the system status Locked (LKD).
  • D. Reservations are deleted.
  • E. The order is no longer relevant for Material Requirements Planning.

Answer: B,D,E

 

NEW QUESTION 61
Which property applies for consumption with planning strategy 40 (planning with final assembly)?

  • A. Consumption takes place with the planning material.
  • B. Consumption can reduce the originally planned production quantity.
  • C. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
  • D. Consumption can result in subsequent adjustments of planned receipts.

Answer: D

 

NEW QUESTION 62
You want to use the function "Read PP master data" in the production order.
However, while calling the function you receive an error message.
What could be the reason?

  • A. The material availability check has been performed.
  • B. Order papers have been printed.
  • C. The production order has been released.
  • D. Goods movements have been posted.

Answer: D

 

NEW QUESTION 63
Which of the following properties about the planning functions available in SAP ECC applies?

  • A. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
  • B. Master production scheduling (MPS) refers to preferred planning of important materials.
  • C. Long-term planning (LTP) is a long-term form of forecasting.
  • D. Material requirements planning (MRP) includes automatic capacity leveling.

Answer: B

 

NEW QUESTION 64
The company you advise wants to control the availability check in so that when a production and/or process order is created, the following receipts or issues are taken into account: planned orders, purchase orders, production orders, reservations, dependent requirements. When the production and/or process order is released, only the stock that is currently freely usable should be taken into consideration. How can you fulfill this request?

  • A. Enter an appropriate availability checking group in the material master.
  • B. Differentiated assignment of two different checking rules in check control.
  • C. Activate the freely usable stock in the scope of check.
  • D. Enter an appropriate availability checking rule in the order type.

Answer: B

 

NEW QUESTION 65
Which of the following structural elements does a process order have? (Choose three.)

  • A. Phases
  • B. Relationships
  • C. Characteristic-based process instructions
  • D. Item data
  • E. Parallel sequences

Answer: A,B,C

 

NEW QUESTION 66
In which master data object do you set the standard values for an operation?

  • A. Routing
  • B. Work Center
  • C. Production Resource/Tool (PRT)
  • D. Material Master

Answer: A

 

NEW QUESTION 67
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)

  • A. Reorder point planned materials can be included in LTP.
  • B. LTP creates purchase requisitions for external procurement.
  • C. LTP focuses on the operational planning of important components.
  • D. A planning scenario must be released before it can be used in LTP.

Answer: A,D

 

NEW QUESTION 68
What do you have to consider regarding consumption? (Choose two)

  • A. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
  • B. Consumption is restructured with the planning run.
  • C. Consumption takes place on the material level between the planned independent requirements and the planned orders.
  • D. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.

Answer: A,D

 

NEW QUESTION 69
In which scenario will the error message shown in the attached screenshot occur?
Exhibit:

Exhibit

  • A. A valid routing exists, but the material master is set to manual routing selection.
  • B. The routing is not valid at the explosion date.
  • C. A valid routing exists, but the Customizing for the order type is set to manual routing selection.
  • D. The selection method is set to "selection only by production version" in the material master.

Answer: B

 

NEW QUESTION 70
What could be a consequence of the confirmation of an operation?

  • A. Rescheduling of the production order
  • B. Settlement of the actual costs
  • C. Update of the planned costs
  • D. Reduction of capacity requirements

Answer: D

 

NEW QUESTION 71
Which of the following elements can be used in a process order? (Choose three)

  • A. Process instructions
  • B. Phases
  • C. Relationships
  • D. Suboperations
  • E. Parallel sequences

Answer: A,B,C

 

NEW QUESTION 72
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?

  • A. It propagates exception messages from a component to the finished product.
  • B. It triggers multilevel bottom-up scheduling.
  • C. It posts planning results to the database automatically.
  • D. It calculates the delay time which may occur in planning.

Answer: D

 

NEW QUESTION 73
During the processing of production orders planned and actual costs are determined.
On which of the following objects can you collect these costs? (Choose two)

  • A. Work center
  • B. Product cost collector
  • C. Planned order
  • D. Production order

Answer: B,D

 

NEW QUESTION 74
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.

What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?

  • A. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master.
  • B. Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group.
  • C. Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.
  • D. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing.

Answer: D

 

NEW QUESTION 75
You select the master data for production orders via production versions.
Which information is contained in a production version?

  • A. The control parameters for selecting routings and BOM
  • B. The explosion dates for the routing and BOM
  • C. The routing and BOM alternatives to be used
  • D. The default order type to be used

Answer: C

 

NEW QUESTION 76
What are characteristics of repetitive manufacturing? (Choose three)

  • A. Continuous material consumption, production flow and output
  • B. Shop fabrication
  • C. Automatic line loading based on capacity limits across all production lines
  • D. Period-based planning of the quantities to be produced
  • E. Production without using production orders and without status management

Answer: A,D,E

 

NEW QUESTION 77
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)

  • A. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  • B. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  • C. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  • D. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.

Answer: A,D

 

NEW QUESTION 78
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)

  • A. Routing
  • B. Work Center
  • C. Material Master (Finished Product)
  • D. Production Scheduling Profile
  • E. Material Master (Component)

Answer: A,B,E

 

NEW QUESTION 79
In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).

What could be the reason?

  • A. The repetitive manufacturing indicator has been set.
  • B. There is no valid production version for this material.
  • C. There are no planned orders or production orders present.
  • D. There are no requirements present.

Answer: B

 

NEW QUESTION 80
......

C_TSCM42_67 Exam Dumps Pass with Updated 2021 Certified Exam Questions: https://www.braindumpquiz.com/C_TSCM42_67-exam-material.html