NEW QUESTION 17
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • B. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
  • C. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
  • D. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.

Answer: A

 

NEW QUESTION 18
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements only if the work center has sufficient capacity.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • D. MRP creates capacity requirements without checking the capacity of a work center.

Answer: D

 

NEW QUESTION 19
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The cross-plant status
  • B. The least restrictive status
  • C. The most restrictive status
  • D. The plant-specific status

Answer: C

 

NEW QUESTION 20
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?

  • A. Use batch determination.
  • B. Use the material where-used report.
  • C. Use the material staging report.
  • D. Use the batch information cockpit.

Answer: D

 

NEW QUESTION 21
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a transportation resource in the location master.
  • B. Model a handling resource in the location master and goods receipt time in the mater all master.
  • C. Model a separate resource inthe production data structure.
  • D. Model a resource inbound in the location master.

Answer: A,B

 

NEW QUESTION 22
What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

  • A. Scheduling agreement schedule line
  • B. Purchase requisition
  • C. Stock transport order
  • D. Planned order
  • E. Production order

Answer: A,B,D

 

NEW QUESTION 23
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.

  • A. Individualconversion
  • B. Full conversion
  • C. Partial conversion
  • D. Order release

Answer: B,C

 

NEW QUESTION 24
What is a work center hierarchy in SAP S/4HANA capacity planning?

  • A. A group of alternative work centers for production, structured in hierarchy levels by prior ties
  • B. A group of work centers in a production line beingused in sequence for production
  • C. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
  • D. A group of alternative work centers providing a cumulative available capacity for production

Answer: D

 

NEW QUESTION 25
In your project,you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP planning file
  • B. MRP type
  • C. MRP group
  • D. MRP controller

Answer: D

 

NEW QUESTION 26
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Production orders are created with sales order reference.
  • B. Sales order-specific stock is created
  • C. Sales order-specific planning run is required.
  • D. Storage location MRP areas are required.
  • E. Net requirements calculation is sales order-specific.

Answer: A,B,E

 

NEW QUESTION 27
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

  • A. Creation of dependent requirements
  • B. Change of the storage bin
  • C. Change of the material'sprocurement type
  • D. Creation of a purchasing contract
  • E. Creation of a sales order

Answer: A,C,E

 

NEW QUESTION 28
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Work center hierarchy
  • B. Resource network
  • C. Operation network
  • D. Setup matrix

Answer: A

 

NEW QUESTION 29
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

  • A. The work center has several individual capacities.
  • B. The Change Planning Direct on indicator is set.
  • C. Alternative resources are fully occupied.
  • D. The planning strategy is infinite.

Answer: A,D

 

NEW QUESTION 30
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?

  • A. Validity period or sales order
  • B. Planned order or materialnumber
  • C. Alphanumeric or quota arrangement
  • D. Lot size or material cost

Answer: C

 

NEW QUESTION 31
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To make the assignment of components easier
  • B. To reduce the number of material masters
  • C. To increase the number of planning levels
  • D. To reduce the number of changes required in bills of material
  • E. Tosimplify the structure of bills of material

Answer: A,D,E

 

NEW QUESTION 32
......