NEW QUESTION 13
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a production order.
- B. It is converted into a planned order.
- C. It is converted into a reservation.
- D. It is converted into a schedule line.
Answer: C
NEW QUESTION 14
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.
- A. The display template for material numbers applies to all clients.
- B. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
- C. In Customizing you can decide by material type whether to use the long material number.
- D. The number of leading zeros for internal numbers is client-specific.
Answer: A,B
NEW QUESTION 15
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
- A. Top of Red
- B. Top of Yellow
- C. Top of Red Base
- D. Top of Green
Answer: D
NEW QUESTION 16
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Planning with final assembly (40)
- B. Make-to-stock production (10)
- C. Make-to-order production (20)
- D. Planning without final assembly (50)
Answer: A
NEW QUESTION 17
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. By period
- B. By material type
- C. By industry
- D. By plant
Answer: A,D
NEW QUESTION 18
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A. Wait time
- B. Move time
- C. Float before production
- D. Pick/pack time
- E. Queue time
Answer: A,D,E
NEW QUESTION 19
Which of the following is a valid sequence of the main activities in product on order processing?
- A. Creation, staging, release, material withdrawal, confirmation
- B. Creation, scheduling, release, variance calculation, confirmation
- C. Creation, scheduling, release, material withdrawal, confirmation
- D. Creation, release, scheduling, material withdrawal, confirmation
Answer: C
NEW QUESTION 20
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements only if the work center has sufficient capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP creates capacity requirements without checking the capacity of a work center.
- D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
Answer: C
NEW QUESTION 21
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?
- A. Production order release
- B. Kanban
- C. Back flushing
- D. Material requirements planning
Answer: D
NEW QUESTION 22
How can you set up the supply source for the SAP Kanban process? Note: There are 3correct answers to this question.
- A. Using quotations for internal and external procurement
- B. Using purchase orders for external procurement
- C. Using run schedule quantities for in-house production
- D. Using stock transfer reservations for stock transfer
- E. Using purchasing costs for automated source prioritization
Answer: B,C,D
NEW QUESTION 23
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.
- A. Order-related
- B. Milestone-related
- C. Cost-related
- D. Product-related
Answer: A,D
NEW QUESTION 24
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with more than one work center
- B. A production line with prioritized alternative work centers
- C. A production line with an alternative sequence in the routing
- D. A production line with a parallel sequence in the routing
Answer: A
NEW QUESTION 25
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.
- A. In-house production time
- B. Total replenishment lead time
- C. Operation duration
- D. Planned delivery time
Answer: A,D
NEW QUESTION 26
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Supply Chain Management (SCM)
- B. Material Requirements Planning (MRP)
- C. Capacity Requirements Planning (CRP)
- D. Integrated Business Planning (IBP)
Answer: A,D
NEW QUESTION 27
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
- A. Use batch determination.
- B. Use the material where-used report.
- C. Use the material staging report.
- D. Use the batch information cockpit.
Answer: D
NEW QUESTION 28
What is a work center hierarchy in SAP S/4HANA capacity planning?
- A. A group of alternative work centers providing a cumulative available capacity for production
- B. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
- C. A group of alternative work centers for production, structured in hierarchy levels by prior ties
- D. A group of work centers in a production line beingused in sequence for production
Answer: A
NEW QUESTION 29
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. Plant Data
- B. MRP Controller
- C. MRP Group
- D. MRP Profile
Answer: C
NEW QUESTION 30
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Sales order-specific planning run is required.
- B. Sales order-specific stock is created
- C. Production orders are created with sales order reference.
- D. Storage location MRP areas are required.
- E. Net requirements calculation is sales order-specific.
Answer: B,C,E
NEW QUESTION 31
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Planning without final assembly (50)
- B. Planning at assembly level (70)
- C. Make-to-order production (20)
- D. Planning with final assembly (40)
Answer: A
NEW QUESTION 32
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.
- A. Use a specific material group
- B. Use a specific MRP type.
- C. Use a specific material status.
- D. Use a specific MRP controller.
Answer: B,D
NEW QUESTION 33
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A. The plant-specific status
- B. The least restrictive status
- C. The cross-plant status
- D. The most restrictive status
Answer: D
NEW QUESTION 34
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Quantity
- B. Installation point
- C. Item type
- D. Scrap percentage
Answer: A,B
NEW QUESTION 35
......
Tested Material Used To C_TS422_2020: https://www.braindumpquiz.com/C_TS422_2020-exam-material.html