NEW QUESTION # 43
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. By material type
- B. By plant
- C. By change number
- D. By material status
Answer: A,B
NEW QUESTION # 44
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.
- A. You post the entire manufactured quantity to multiple batches if the product quality changes during production.
- B. You post the entire manufactured quantity to one batch if the product quality changes during production.
- C. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
- D. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
Answer: A,D
NEW QUESTION # 45
Why would you use phantom assemblies?
Note: There are 2 correct answers to this question.
- A. To make the assignment of components easier
- B. To reduce the number of material masters
- C. To make the procurement easier
- D. To enable simple structuring of BOMs
Answer: A,D
NEW QUESTION # 46
Which alternative item strategies are available in bills of material (BOMs)?
Note: There are 2 correct answers to this question.
- A. Simultaneous
- B. Ranking
- C. Manual maintenance
- D. 100% check
Answer: C,D
NEW QUESTION # 47
What is a work center hierarchy?
- A. A group of work centers in a production line that is used in sequence for production
- B. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
- C. A group of alternative work centers for production, structured in hierarchy levels by priorities
- D. A group of alternative work centers providing a cumulative available capacity for production
Answer: D
NEW QUESTION # 48
When does the system trigger replenishment for a Kanban container?
- A. When you set the container to Waiting
- B. When you set the container to Empty
- C. When you set the container to In transit
- D. When you set the container to Full
Answer: B
NEW QUESTION # 49
Which settings can you make in a production scheduling profile?
Note: There are 3 correct answers to this question.
- A. Automatic goods issue on confirmation
- B. Default order types
- C. Automatic release on order creation
- D. Automatic print on order creation
- E. Automatic goods receipt on confirmation
Answer: B,C,E
NEW QUESTION # 50
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?
- A. SAP Signavio Process Insights
- B. SAP Signavio Process Governance
- C. SAP Signavio Process Intelligence
- D. SAP Signavio Process Manager
Answer: D
NEW QUESTION # 51
When do you use variant bills of material (BOMs)?
- A. When a material has multiple BOMs
- B. When multiple materials have multiple BOMS
- C. When multiple materials have similar BOMS
- D. When a material has a configurable BOM
Answer: C
NEW QUESTION # 52
What options are available inside a document?
Note: There are 2 correct answers to this question.
- A. Plant links
- B. Versioning
- C. Storage locations
- D. Object links
Answer: B,D
NEW QUESTION # 53
When can you maintain the batch characteristic values in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. When you record inspection results
- B. When you post the goods receipt
- C. When you release the batch
- D. When you execute batch determination
Answer: A,B
NEW QUESTION # 54
Which planning strategies can you use in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. Planning mode > Order priority
- B. Scheduling control > Find slot
- C. Scheduling control > Close gap
- D. Planning mode > Bucket
Answer: B,D
NEW QUESTION # 55
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.
- A. Changing a storage bin
- B. Changing a delivery address
- C. Changing a dependent requirement
- D. Changing an operation time
Answer: C,D
NEW QUESTION # 56
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Work center capacities chart
- B. Capacity requirements chart
- C. Order (dispatched) chart
- D. Order (pool) chart
Answer: A,B
NEW QUESTION # 57
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.
- A. The same batch management level is used.
- B. The quantity and value updates are the same.
- C. The same base unit of measure is used.
- D. The same account category is used.
Answer: B,C
NEW QUESTION # 58
In SAP documentation for MRP in Advanced Planning, you read that the MRP creates new planned orders through infinite scheduling. What does this mean for the capacity requirements of the new planned order?
- A. MRP creates the capacity requirements without considering existing load on the resources.
- B. MRP automatically assigns the capacity requirements to resources with the earliest available capacity.
- C. MRP creates the capacity requirements on resources at the earliest possible production time.
- D. MRP automatically assigns the capacity requirements after the last scheduled operation for each resource.
Answer: A
NEW QUESTION # 59
How can you achieve a feasible production plan when there are capacity constraints?
Note: There are 3 correct answers to this question.
- A. Execute an infinite production planning run for the critical resources
- B. Increase the capacity supply in a time-phased interval
- C. Reduce the planning time interval
- D. Determine a time period with available capacity on the planning board
- E. Form optimum sequences to reduce setup times
Answer: B,D,E
NEW QUESTION # 60
Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. Use the special MRP type XO
- B. Use a different MRP planner for PP/DS materials
- C. Use the material number for selection
- D. Use a propagation range
Answer: A,B
NEW QUESTION # 61
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?
- A. The MRP run starts with external procurement.
- B. The MRP run does NOT consider the material; it has to be planned interactively.
- C. The MRP run starts with in-house production.
- D. The MRP run plans the material only if a quotation has been maintained.
Answer: C
NEW QUESTION # 62
You want to verify that the properties of a component batch align with the required properties of the raw material intended for a specific process order. What function do you use to accomplish this?
- A. Batch determination
- B. Batch where-used list
- C. Batch number assignment
- D. Batch information cockpit
Answer: A
NEW QUESTION # 63
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Which base unit of measure must the BOM have?
- B. In which storage location is the BOM required?
- C. For which plant can the BOM be defined?
- D. When does the BOM need to become effective?
Answer: C,D
NEW QUESTION # 64
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.
- A. Market intelligence
- B. Past production planning quantities
- C. Past quotation quantities
- D. Past sales order quantities
- E. One-off events
Answer: A,D,E
NEW QUESTION # 65
What is the focus of repetitive manufacturing?
- A. Low volume production
- B. Production of lot size one
- C. Detailed tracking of production orders
- D. Period and quantity-oriented production
Answer: D
NEW QUESTION # 66
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.
- A. MRP group
- B. MRP type
- C. Material type
- D. Procurement type
Answer: B,D
NEW QUESTION # 67
......