
[Jan-2024] Dumps Brief Outline Of The C_TS422_2021 Exam - BraindumpQuiz
C_TS422_2021 Training & Certification Get Latest SAP Certified Application Associate
The C-TS422-2021 exam covers a wide range of topics related to production planning and manufacturing, including material requirements planning (MRP), production orders, bills of material (BOM), capacity planning, and shop floor control. Candidates will also be tested on their ability to configure and use SAP S/4HANA for production planning and manufacturing processes.
SAP C_TS422_2021 certification exam is designed for individuals who have a solid understanding of the SAP S/4HANA platform and its production planning and manufacturing capabilities. It is recommended that candidates have at least two years of experience working with SAP in a production planning or manufacturing role before attempting the exam. Candidates are also required to have a good understanding of the underlying business processes that drive production planning and manufacturing in an organization.
SAP C-TS422-2021 certification exam is designed for professionals who wish to validate their skills and knowledge in SAP S/4HANA Production Planning and Manufacturing. C_TS422_2021 exam covers various topics such as production orders, material requirements planning, capacity planning, and shop floor control. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification exam is intended for individuals who work in the area of production planning and manufacturing and have a basic understanding of SAP S/4HANA. By passing C_TS422_2021 exam, candidates can demonstrate their proficiency in SAP S/4HANA production planning and manufacturing, which can be a valuable asset for their career growth.
NEW QUESTION # 37
How can you set up the supply source for the Kanban process in SAP S/4HANA?
- A. Using quotations for internal and external procurement
- B. Using purchasing costs for automated source prioritization
- C. Using purchase orders for external procurement
- D. Using stock transfer reservations for stock transfer
- E. Using run schedule quantities for in-house production
Answer: C,D,E
NEW QUESTION # 38
How can you achive a feasible production plan in case of capacity constraints?
- A. Reduce the planning window
- B. Adjust the available capacity.
- C. Select an alternative mode on a resource.
- D. Execute an infinite production planning run
- E. Form optimum sequence to reduce setup times
Answer: B,C,E
NEW QUESTION # 39
Which of the following processes lead to an entry in the MRP planing file?
- A. Change of the storage bin
- B. Change of the material's procurement type
- C. Creation of sales order
- D. Creation of purchasing contract
- E. Creation of dependent requirements
Answer: B,C,E
NEW QUESTION # 40
In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?
- A. Use a specific material status
- B. Use a specific MRP type
- C. Use a specific material group
- D. Use specific MRP controller
Answer: C,D
NEW QUESTION # 41
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?
- A. Use the batch information cockpit.
- B. Use the material where-used report.
- C. Use batch determination.
- D. Use the material staging report.
Answer: A
NEW QUESTION # 42
In the Schedule Production app which setting can you make for the planning strategy?
- A. Direction
- B. Fitness level
- C. Scheduling control
- D. Fixed pegging
- E. Planning mode
Answer: A,C,E
NEW QUESTION # 43
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?
- A. Change the special procurement key of the phantom assembly in the BOM.
- B. Change the phantom item indicator for the phantom assembly in the BOM.
- C. Change the explosion type of the phantom assembly in the BOM.
- D. Change the item category of the phantom assembly in the BOM.
Answer: C
NEW QUESTION # 44
Which materials have a negative quantity in a bill of materials or in a recipe?
- A. By-products
- B. Bulk materials
- C. Co-products
- D. Waste products
- E. Continuous flow materials
Answer: A,C,E
NEW QUESTION # 45
What is the purpose of a reporting point confirmation in repetitive manufacturing?
- A. To reduce the total production lead time for along production line
- B. To stage different components for a production line simultaneously
- C. To determine the work in progress along the production line
- D. To provide timely updates of inventory management for the staged components
Answer: C,D
NEW QUESTION # 46
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Rate routing
- B. Production supply area
- C. Control cycle
- D. Replenishment strategy
Answer: C
NEW QUESTION # 47
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?
- A. Supply Network Planning (SNP)
- B. Capacity Requirements Planning (CRP)
- C. Demand Planning (DP)
- D. Material Requirements Planning (MRP)
Answer: D
NEW QUESTION # 48
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
- A. Production order
- B. Purchase requistion
- C. Scheduling agreement schedule line
- D. Stock transport order
- E. Planned order
Answer: B,C,E
NEW QUESTION # 49
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Make-to-order production (20)
- B. Planning without final assembly (50)
- C. Planning at assembly level (70)
- D. Planning with final assembly (40)
Answer: B
NEW QUESTION # 50
Which chart types does the tabular planning table provide in SAP S/4HANA
- A. Order (pool) chart
- B. Work center capacities chart
- C. Order (dispatched) chart
- D. Capacity requirements chart
Answer: B,D
NEW QUESTION # 51
What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planed order is converted to production order.
- B. The planed order generates capacity requirements
- C. The planed order's component availability is checked.
- D. The planned order's components are copied to the picking list.
Answer: B
NEW QUESTION # 52
......
Certification Training for C_TS422_2021 Exam Dumps Test Engine: https://www.braindumpquiz.com/C_TS422_2021-exam-material.html
SAP Certified Application Associate C_TS422_2021 Real Exam Questions and Answers FREE Updated: https://drive.google.com/open?id=1Ip9bx3tEPMZe3R_Dqoizn8_NIxdSZvz9