NEW QUESTION # 181
What has to be present for a shoring box to be usable.

  • A. For the purpose of listing materials category
  • B. Tag or documents certifying it has been inspected
  • C. Identifying, documenting and oversee activity
  • D. Climatic and other work condition hazards

Answer: A


NEW QUESTION # 182
Cathodic protection wire is attached to a pipe by a _______.

  • A. Compression
  • B. CAD weld
  • C. Welding operator
  • D. Design validation

Answer: C


NEW QUESTION # 183
Color used for sewers and drain lines

  • A. Yellow
  • B. Green
  • C. Red
  • D. Blue

Answer: D


NEW QUESTION # 184
Define SPCC

  • A. Spill prevention, control, and containment
  • B. Resource conservative in recovery act
  • C. Operator qualification
  • D. National pollutant discharge elimination systems

Answer: A


NEW QUESTION # 185
What is the primary issue that must be addressed with Crossing navigable waters with a natural gas pipeline?

  • A. Safety concerns(general knowledge)
  • B. Msds(general knowledge)
  • C. A diffuser (general knowledge)
  • D. The quality policy(iso 9000 3.5.8)

Answer: A


NEW QUESTION # 186
Dents have to be repaired by

  • A. weight of the pipe including components
  • B. Tag or documents certifying it has been inspected
  • C. cutting out the entire entire diameter/cylinder of the pipe
  • D. 100s of feet with additional footage shown as pulses

Answer: C


NEW QUESTION # 187
Field beveling of pipe ends by manual oxygen cutting is or is not acceptable if authorized by the company?

  • A. 100%
  • B. grind or sand the surface to bare metal prior to welding.
  • C. Is
  • D. A vertical line in the back of the ears

Answer: A


NEW QUESTION # 188
Standards for slope based on soil type

  • A. 49 cfr 192.505
  • B. table c-1.1 of 29 cfr 1926
  • C. 29 Cfr 1926 Pg 52
  • D. 29 CFR 1926 Pg 103

Answer: D


NEW QUESTION # 189
On Class 1 pipe, What percentage of pipe must be NDT tested?

  • A. 10% except off-shore
  • B. 15% except off-shore
  • C. 35% except off-shore
  • D. 100%192.243

Answer: C


NEW QUESTION # 190
Name the uniform color code colours and what they mean.

  • A. Part of quality management focused on fulfilling quality requirements(ISO 9000 3.3.7)
  • B. terrain features; landowner issues; road, railroad, or waterway crossing; environmental features; cultural features and protected resources (i.e. drinking water and proximity to occupied facilities)
  • C. Part of quality management focussed on setting quality objectives and specifying necessary operational processes, and resources to achieve the quality objectives(ISO 9000 3.3.5)

Answer: B


NEW QUESTION # 191
What would be a discovered or potential pipeline route selection deficiencies or obstruction?

  • A. A diffuser(general knowledge)
  • B. An entity that includes the primary organization and any subcontractors engaged in pipeline construction covered by ARPI 1169 3.1.1
  • C. terrain features; landowner issues; road, railroad, or waterway crossing; environmental features; cultural features and protected resources (i.e. drinking water and proximity to occupied facilities)
  • D. Hearing protection is used when the work environment noise level exceeds 85 dbA over an 8-hour period

Answer: C


NEW QUESTION # 192
Green

  • A. Sewers and drain lines
  • B. Proposed excavation
  • C. Potable water
  • D. Communication, alarm or signal lines

Answer: A


NEW QUESTION # 193
Backhoe teeth shall be ? each time the bucket approaches the existing facility.

  • A. The owner
  • B. Barred or curled
  • C. Owner operator
  • D. Msds (general knowledge)

Answer: D


NEW QUESTION # 194
There should be enough clearance between transmission lines to allow for ____________ and _____________.
49 CFR 192.325

  • A. Maintenance/protection
  • B. 1.25
  • C. 75 / 25
  • D. 5 / 50

Answer: B


NEW QUESTION # 195
At a minimum, install and maintain temporary sediment barriers
across the entire construction right-of-way at the base of slopes greater than ________percent where the base of the slope is less than ________ feet from a waterbody

  • A. 12 / 120
  • B. 100 ft
  • C. 10 / 100
  • D. 5 / 50

Answer: D


NEW QUESTION # 196
Validation can include?

  • A. Class Soil RockClass 1 30 (762) 18 (457)Class 2, 3, 4 36 (914) 24 (610)Drainage ditches of public roads and railroad crossings36 (914) 24 (610)
  • B. Identifying, documenting and oversee activity
  • C. Prototype testsfunctional operational teststests specified by industry standards and reg reqsField performance tests and reviews
  • D. it provides proper support for the pipe and prevents damage to the pipe and its coating

Answer: C


NEW QUESTION # 197
What standard covers strength test requirements for steel pipe to operate at hoop stress of more than 30% of SMYS.

  • A. 49 Cfr 202.505
  • B. 49 CFR 192.505
  • C. 3192.233
  • D. 72/smys

Answer: D


NEW QUESTION # 198
ACI

  • A. American Concrete Institute
  • B. White
  • C. Concrete Reinforcing Steel Institute
  • D. Purple

Answer: A


NEW QUESTION # 199
If pipe has a longitudinal weld the bend must be located in the ___________

  • A. Neutral axis
  • B. Horizontal directional drilling
  • C. Structural frame
  • D. Negative deformation

Answer: A


NEW QUESTION # 200
......