SAP C_TSCM42_64 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 |
| Exam Number: | C_TSCM42_64 |
| Exam Price: | Varies by region (~USD 500) |
| Passing Score: | 65% |
| Available Languages: | German, English |
| Certificate Validity Period: | No formal expiration (legacy certification validity may vary) |
| Exam Format: | Multiple Choice, Multiple Response, Scenario-based Questions |
| Related Certifications: | SAP Certified Application Associate - SAP S/4HANA Production Planning SAP Certified Application Associate - Production Planning & Manufacturing (SAP ERP) |
| Real Exam Qty: | 80 |
| Exam Duration: | 180 minutes |
| Sample Questions: | SAP C_TSCM42_64 Sample Questions |
| Exam Way: | Online proctored exam via SAP Certification Hub or authorized test centers |
| Pre Condition: | Basic knowledge of SAP ERP systems and manufacturing/production planning processes is recommended |
| Official Syllabus URL: | https://www.sap.com/training-certification.html |
SAP C_TSCM42_64 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Topic 1: Demand Management and Planning | - Sales and Operations Planning (SOP)
|
| Topic 2: Capacity Planning and Shop Floor Control | - Capacity Requirements Planning
|
| Topic 3: Master Data for Production Planning | - Work Centers and Routings
|
| Topic 4: Material Requirements Planning (MRP) | - MRP Execution
|
| Topic 5: Enterprise Structure in Production Planning | - Organizational Units in SAP ERP
|
| Topic 6: Production Orders and Execution | - Production Order Processing
|
| Topic 7: Integration with Other SAP Modules | - MM Integration
|
SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 Sample Questions:
A finished material is to be planned in a controlled manner in the SAP ECC system in the context of requirements planning. The planned orders are scheduled using what is known as basic date scheduling (not lead-time scheduling). Which of the following statements is true for the resulting dependent requirements?
- A. If individual material components are explicitly assigned to operations during BOM and routing maintenance, the requirement dates of the dependent requirements for these components are scheduled at each of the operation start dates.
- B. When a customer order is created for the finished product, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
- C. In multi-level backward scheduling, dependent requirements are triggered at the start date for the higher-level assembly.
- D. In multi-level backward scheduling, dependent requirements are triggered at the start date for the higher-level assembly planned order.
Correct Answer: C 🗳️
CORRECT TEXT
Which of the following statements is true for the simulation mode in the context of material requirements planning in SAP ECC?
- A. The simulation mode represents an interactive multilevel form of planning, the result of which is automatically posted to the database after the planning run.
- B. The simulation mode is used in scenarios in which requirements planning created the procurement element prematurely in terms of demand.
- C. Assuming a delay time in the critical path, the simulation mode triggers multilevel bottom-up scheduling through to the finished product, which therefore receives a delayed receipt.
- D. The simulation mode opens the analysis of the delay time. Manual rescheduling of the receipt in the finished product and subsequent requirements planning lead to a solution that is feasible from the requirements planning perspective. However, this solution may lead to a date/time violation in the finished product.
Correct Answer: D 🗳️
A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements?
- A. Plant data collection (PP-PDC) interface
- B. Execution Steps (XSteps) and process messages
- C. SAP Business Intelligence (BI)
- D. SAP Application Link Enabling (ALE)
Correct Answer: B 🗳️
The company you advise wants to control the availability check in so that when a production and/or process order is created, the following receipts or issues are taken into account: planned orders, purchase orders, production orders, reservations, dependent requirements. When the production and/or process order is released, only the stock that is currently freely usable should be taken into consideration. How can you fulfill this request?
- A. Enter an appropriate availability checking rule in the order type.
- B. Enter an appropriate availability checking group in the material master.
- C. Activate the freely usable stock in the scope of check.
- D. Differentiated assignment of two different checking rules in check control.
Correct Answer: D 🗳️
In your company planning strategies are used in the SAP-ECC demand management that are based on consumption. Which of the following statements about consumption is true?
(Choose two.)
- A. Consumption can also take place between order reservations and planned independent requirements, depending on the strategy.
- B. A consumption situation is dynamic and is always restructured with the planning run.
- C. The consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
- D. Consumption always takes place on the material level between the planned independent requirements and the planned orders.
Correct Answer: A,C 🗳️