[Nov 26, 2021] C-ARSUM-2105 Test Engine files, C-ARSUM-2105 Dumps PDF [Q14-Q36]

Share

[Nov 26, 2021] C-ARSUM-2105 Test Engine files, C-ARSUM-2105 Dumps PDF 

Latest SAP C-ARSUM-2105 PDF and Dumps (2021) Free Exam Questions Answers

NEW QUESTION 14
During the preferred supplier management process, what happens after the approver reviews the category status change request?

  • A. The requesting user is notified when the request was approved or denied.
  • B. The requesting user will be issued a final approve or deny action on the status request.
  • C. The supplier will be sent again through the registration process under their preferred category status.
  • D. The supplier user is notified when the request was approved or denied.

Answer: A

 

NEW QUESTION 15
Which of the following abilities are specific for an advanced approval flow?
Note: There are 3 correct answers to this question.

  • A. Assign approvers using approver lookup tables.
  • B. Associate multiple documents to the approval task.
  • C. Specify project groups and system groups.
  • D. Add conditions to approval nodes.
  • E. Combine serial and parallel flow types.

Answer: A,D,E

 

NEW QUESTION 16
Your customer needs to initiate and manage supplier registrations, qualifications, and disqualifications.
Which SAP Ariba Supplier Information and Performance Management system groups do you assign to a category buyer?
Note: There are 2 correct answers to this question.

  • A. Supplier Request Manager
  • B. Supplier Registration Manager
  • C. Preferred Supplier Manager
  • D. Supplier Qualification Manager

Answer: B,D

 

NEW QUESTION 17
For which SAP Ariba project type are ad-hoc custom fields supported?

  • A. Supplier Request project
  • B. Supplier Qualification project
  • C. Supplier Registration project
  • D. Supplier Performance Management project

Answer: D

 

NEW QUESTION 18
Your customer wants to designate a supplier as Preferred for a specific commodity and region. However, the ability to perform the preferred supplier process is NOT appearing. Why is this the case?

  • A. The supplier was marked as Preferred for a different commodity and region combination.
  • B. The commodity selected is a parent. A child commodity must be selected.
  • C. The latest version of the preferred supplier template was NOT published.
  • D. The supplier was NOT qualified for that specific commodity and region combination.

Answer: D

 

NEW QUESTION 19
Which content types within a survey can you map to KPIs?
Note: There are 2 correct answers to this question.

  • A. Section
  • B. Requirement
  • C. Question
  • D. Attachment

Answer: A,C

 

NEW QUESTION 20
After a supplier is registered, which of the following activities can be performed within the Registration tile?

  • A. Request preferred status.
  • B. Access the supplier request form.
  • C. View the registration approval flow.
  • D. Update the primary supplier contact.

Answer: C

 

NEW QUESTION 21
You are creating a new SAP Ariba Supplier Performance Management template from scratch. What does SAP Ariba recommend to include?
Note: There are 3 correct answers to this question.

  • A. Folder
  • B. Scorecard document
  • C. Recurrence phase
  • D. SPM analysis report
  • E. Survey document

Answer: A,B,E

 

NEW QUESTION 22
Where can you store reports in an SAP Ariba Supplier Information and Performance Management project?

  • A. On the documents tab
  • B. On the Tasks tab
  • C. On the Overview tab
  • D. On the Message Board tab

Answer: A

 

NEW QUESTION 23
You uploaded suppliers using the mass registration invitation through the Supplier Management Administration and it states there are errors. What action do you perform?

  • A. Select Send Invitations and correct the supplier information within the supplier record.
  • B. Correct the whole file and re-upload.
  • C. Correct the suppliers that hat errors and upload the subset of suppliers.
  • D. Change the suppliers information through the SM Administration UI.

Answer: B

 

NEW QUESTION 24
Which task type can you use to invite non-SAP Ariba users to participate in completing a task?

  • A. Approval task
  • B. Publish Document task
  • C. Review task
  • D. To Do task

Answer: C

 

NEW QUESTION 25
Your customer wants all users within a system group or project group to approve a new supplier. Which of the following is a limitation with a simple approval rule for SAP Ariba Supplier Information and Performance Management?

  • A. System groups CANNOT contain users.
  • B. Only one user can be added as an approver in a simple approval rule.
  • C. The system will accept the approval from a single user.
  • D. Project Group members must be assigned using a team member rules file.

Answer: C

 

NEW QUESTION 26
A supplier provides good from three warehouses. You need to publish survey results for each location which map to one scorecard in an SAP Ariba Supplier Performance Management project. Which actions must you perform?
Note: There are 2 correct answers to this question.

  • A. Map each survey question from each location to an individual KPI in the scorecard.
  • B. Merge similar questions from the three surveys into the associated KPI in the scorecard.
  • C. Map KPIs at the section level to summarize survey results for all three locations.
  • D. Link each survey to the scorecard.

Answer: A,C

 

NEW QUESTION 27
All the project template level, which access control is recommended by SAP Ariba Supplier Information and Performance Management?

  • A. Private to Supplier Management/ Pro Users
  • B. Private to Team Members
  • C. Private to Internal Users
  • D. Owner Only

Answer: B

 

NEW QUESTION 28
Which activities occur as part of the pre-grading process?
Note: There are 2 correct answers to this question.

  • A. The grade is pushed to the scorecard.
  • B. The pre-graded value must be approved before the survey can take place
  • C. The default answer needs to calibrate the scoring.
  • D. The system automatically assigns the pre-determined grade for each participant response.

Answer: C,D

 

NEW QUESTION 29
The SAP Ariba Supplier Management portfolio consists of which solutions?
Note: There are 3 correct answers to this question.

  • A. SAP Ariba Supplier Risk
  • B. SAP Ariba Network Supplier Services
  • C. SAP Ariba Supply Chain Collaboration
  • D. SAP Ariba Supplier Lifecycle and Performance
  • E. SAP Ariba Supplier Information and Performance Management

Answer: A,D,E

 

NEW QUESTION 30
Which of the following supplier registration methods are available in SAP Ariba Supplier Lifecycle and Performance?
Note: There are 3 correct answers to this question.

  • A. The supplier submits a registration request to the customer on SAP Ariba Discovery.
  • B. An internal user imports the supplier registration questionnaire directly to the supplier's profile.
  • C. The system automatically invites the supplier to register after the supplier request is approved.
  • D. An internal user performs a mass registration after importing the supplier records.
  • E. An internal user invites the supplier to register after the supplier request is approved.

Answer: C,D,E

 

NEW QUESTION 31
You are applying changes to a Team Member Rules tile for SAP Ariba Supplier Information and Performance Management. After exporting the file, you notice the filed you need to built the rule in is missing from the available fields tab. Why is the field NOT listed?
Note: There are 2 correct answers to this question.

  • A. The field in the Team Member Rules file has a visibility condition assigned to it.
  • B. The field becomes available for use in the Team Member Rules file when it is made reportable.
  • C. The field was deleted from the system prior to the Team Member Rules file being generated.
  • D. The field was created after the Team Member Rules file was first generated.

Answer: B,D

 

NEW QUESTION 32
Phases enable you to perform which of the following activities?
Note: There are 2 correct answers to this question.

  • A. Specify task due dates relative to the start of the parent phase for a task.
  • B. Send an overdue notification when the phase due date has passed.
  • C. Organize tasks according to your business model.
  • D. Add the phase due date to the user's dashboard calendar.

Answer: D

 

NEW QUESTION 33
How do you set a custom supplier ID when you create a new supplier?

  • A. Set SIM Vendor ID in the SAP Ariba UI when approving the supplier request.
  • B. Set Vendor ID number to the custom ID in SAP ERP using transaction XK02.
  • C. Set erpVendorlD in Supplier.csv to the custom ID for upload.
  • D. Set Supplier Identification Number in the SAP Ariba UI registration page to the custom ID.

Answer: C

 

NEW QUESTION 34
Why would you export a project template?

  • A. To use the data outside of SAP Ariba
  • B. To deactivate the project template
  • C. To deploy a new template from test to production
  • D. To use it for another customer site

Answer: C

 

NEW QUESTION 35
Your customer needs to adjust the scoring weight for a KPI based on contractual standards with a particular supplier.
Where should you edit the scoring based on SAP Ariba 's best practice?

  • A. In the project-level period scorecard
  • B. In the template-level master scorecard
  • C. In the sourcing library
  • D. In the project-level master scorecard

Answer: D

 

NEW QUESTION 36
......


SAP C-ARSUM-2105 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Supplier Lifecycle Management Components > 12%

Use supplier requests, supplier registration, supplier qualification, preferred suppliers and the Category Status area in SAP Ariba Supplier Lifecycle Management.

Supplier Risk Administration 8% - 12%

Configure and administer SAP Ariba Supplier Risk

  • AR741e SAP Learning Hub Content
SAP Ariba Supplier Management Portfolio Overview > 12%

Explain the features and benefits of the products in SAP Ariba's Spend Management portfolio and define key concepts.

SAP Ariba Supplier Performance Management Projects 8% - 12%

Use Supplier Performance Management projects.

Supplier Risk Management 8% - 12%

Use standard and enchanced features to manage supplier risk

  • AR340e SAP Learning Hub Content
Workspace Template Management > 12%

Create and manage workspace templates in SAP Ariba Supplier Performance Management and SAP Ariba Supplier Lifecycle Management.

SAP Ariba Supplier Performance Management Surveys and Scorecards > 12%

Use surveys and scorecards in SAP Ariba Supplier Performance Management.

SAP Ariba Supplier Lifecycle Management Users and Supplier Contacts 8% - 12%

Manage user groups, personas, buyer category assignments and supplier contacts in SAP Ariba Supplier Lifecycle Management.

Supplier Lifecycle Management Administration 8% - 12%

Import supplier records, set up supplier IDs, plan for integration and synchronization with ERPs in SAP Ariba Supplier Lifecycle Management.

  • AR740e SAP Learning Hub

 

Pass Your SAP Certified Application Associate C-ARSUM-2105 Exam on Nov 26, 2021 with 82 Questions: https://www.braindumpquiz.com/C-ARSUM-2105-exam-material.html