NEW QUESTION 17
When designing business objects which of the following statements is true? (Choose three.)

  • A. It's a good practice to split application logic into multiple objects to minimize the process dependencies.
  • B. It's a good practice to keep application logic in one business object so that the process is more efficient.
  • C. It's good practice to split application logic into multiple objects so that the process is more efficient.
  • D. It's best practice to keep application logic in one business object so that there is a single point of reference.
  • E. It's good practice to keep application logic in one business object so that developers know where to find.
  • F. It's good practice to keep application logic in one business object to minimize the process dependencies.
  • G. It's a good practice to split application logic into multiple objects to minimize the effect of change.

Answer: D,F,G

 

NEW QUESTION 18
You are the Lead Developer tasked with delivering four processes for the same client. You have enough developers in the team to develop all the processes in parallel. All the processes have one application in common, another application is used by two processes and one process uses an application that none of the others do. Which of the following statements is true?

  • A. Other than the standard utilities, there should be 3 objects.
  • B. Other than the standard utilities, there should be 7 objects.
  • C. Other than the standard utilities, there should be 4 objects.
  • D. It's not possible to determine how many objects there should be.

Answer: D

 

NEW QUESTION 19
An Insurance company has created 4 Blue Prism processes:
1. Change of Address
2. Claims Processing
3. Renewals
4. Order Letter
The Order Letter process is not a published process but is called as a sub process by each of the 3 other processes.
Each day at 6am a scheduler starts:
* 3 instances of the Renewals process on the same virtual machine
* 2 instances of the Claims Processing process on 2 different virtual machines
* 1 instance of the Change of Address process on its own virtual machine How many licenses will be consumed by the running processes?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 20
It's technically possible for one business object to call another. Outside of using utility objects are any of the following valid reasons why you would want to do this?

  • A. Yes, but only if the object is calling itself.
  • B. Yes, to create a wrapper object as a vehicle for a reusable sequence of application logic.
  • C. Yes but object calling other objects could lead to undesirable memory problems so care must be taken.
  • D. No. objects should never call other objects.

Answer: B

 

NEW QUESTION 21
The status of a Work Queue can be used as a method of recording what work has been done so far on a Work Queue item Please consider the following statements:
1. For Ml, to easily see how far an item has been worked
2 To aid manual working of exceptions, providing the Item Status can inform staff what work is still outstanding on an item that needs manually completing
3. To enable Work Queue items to be safely retried, a process can use the item status to know which updates have already been performed so that they are not repeated
4 To record the Customer's Surname
Which of the statements are valid reasons for updating a case status?

  • A. 1 ,2, 3 and 4
  • B. 2 and 3 only
  • C. 2 only
  • D. 1, 2 and 3

Answer: D

 

NEW QUESTION 22
A proposed Blue Prism solution with the following properties has been created to automate the payment processing:
* There will be one Blue Prism process that will perform the steps described above.
* Where a case is an exception the status will be set in Paytex to "Manual Review" in order that the manual team can pick up the case from Paytex and contact the customer and conclude the case.
* It is anticipated that to meet the SLAs of the expected volumes up to 5 instances of the Blue Prism process will be required to run concurrently.
* A Blue Prism work queue will be used to host the payments. The queue will be configured for only 1 attempt per case and the key will be {region} & {source account number}.
* The process will be started by the scheduler at 06:00 and will stop at 05:50


Which of the following are correct? (select 3 responses).

  • A. The process will not scale i.e. you cannot run multiple instances at the same time
  • B. There is a risk that a payment can be duplicated.
  • C. The process should not be designed to use a Blue Prism Work Queue but use Paytex as the work queue.
  • D. There is a risk that a payment can be orphaned.
  • E. The process should not be automated as it uses a third party web application.
  • F. The solution exposes sensitive personal information

Answer: A,C,F

 

NEW QUESTION 23
Which of the following statements about using Work Queue designs to split a business process into a multi part robotic solution is correct?
1. Using multiple Work Queues and Processes for the different stages of the business process is a valid design option to split a business process into a multi part robotic solution.
2. Using a single Work Queue and deferring cases for future processing is a valid design option to split a business process into a multi part robotic solution.
3. Using an item's status to control when to work it is a valid design option to split a business process into a multi part robotic solution.
4. You cannot split a business process into a multi part robotic solution.

  • A. 1 and 3
  • B. 4 only
  • C. 1 and 2 Only
  • D. 1, 2 and 3

Answer: A

 

NEW QUESTION 24
SanQuest Bank's call center regularly receives requests from customers for the exact amount required to clear their loan. This is a complicated calculation that is prone to human error. The bank has decided to use Blue Prism to perform the calculation and is considering amending its front end system OneBase to allow a user to click a button to request a Loan Consolidation Amount.
They plan to communicate with Blue Prism using web services. Consider the two proposed designs:

Here a Blue Prism object is exposed as a web service. OneBase calls this service providing the account number. The Blue Prism object add the case to a work queue and then returns the Case ID to complete the web service call.
A Blue Prism process works the queue and harvests the data required to perform the calculation. The same Blue Prism process calls a OneBase web service and provides the load settlement figure. OneBase completes the web service call by returning a success flag.

Here the Blue Process that harvests the data is exposed a web service with the loan settlement figure as an output. OneBase calls the web service and provides the account number. The BluePrism process harvests the data and completes the web service call by providing the loan settlement figure.
Considering Blue Prism best practice which of the following statements is correct?

  • A. Design A is the most appropriate option
  • B. Design B is the most appropriate option
  • C. Neither Design A nor Design B is appropriate
  • D. Both Design A and Design B are appropriate

Answer: C

 

NEW QUESTION 25
Which of the following accurately describes best practice when work is sourced from an application's workflow system?

  • A. Blue Prism cannot source work from an application's workflow system
  • B. When sourcing work from an applications workflow system, case data should be stored in an excel document
  • C. Even though there is a workflow system managing and allocating work, a Blue Prism Work Queue should still be used
  • D. There is no need to use a Blue Prism queue as workflow is managed within the application

Answer: D

 

NEW QUESTION 26
The status of a Work Queue can be used as a method of recording that work has been done so far on a Work Queue item.
Please consider the following statements:
1. For MI, to easily see how far an item has been worked.
2. To aid manual working of exceptions, providing the Item Status can inform staff what work is still outstanding on an item that needs manually.
3. To enable Work Queue items to be safely retried, a process can use the item status to know which updates have already been performed so that they are not repeated.
4. To record the Customer's Surname

  • A. 1, 2 and 3 only
  • B. 2 and 3 only
  • C. 2 only
  • D. 1, 2, 3 and 4

Answer: C

 

NEW QUESTION 27
A process is required for a telecoms company to work cases supplied via a daily Excel file Although the file will only contain around 1000 rows, the average case time is such that the workload is far too big for one machine to complete in a day, so the solution has been designed with multiple machines in mind. One machine will load the work queue while the others wait, then once the queue is ready all machines will work it together.
The requirements state that the input file is machine generated, has a known format is generally clean but may contain exceptions - rows with an empty cell, partial phone numbers, or accounts that don't exist. What should the solution do to combat this problem?

  • A. The solution should read the file and load the queue without validating the data The data validation should be the first step in working a queue item, with invalid cases marked as exceptions.
  • B. The solution should read the file and then loop through the resulting collection and discard any row with either missing, incomplete or invalid data. Then the 'clean' collection should then be loaded into the queue
  • C. The solution should open the file and delete any row with either missing, incomplete or invalid data.
    Then the clean' file should be read and the resulting collection added to the queue.
  • D. The solution should validate the data and check that the accounts exist in the target applications beforehand, so that only clean cases are loaded into the queue.
  • E. The solution should apply a filter to the Excel file to hide any row with empty cells and only load the complete rows.

Answer: B

 

NEW QUESTION 28
MedBank have recently introduced a new Credit Card platform Cred+. There is a requirement to migrate account and card details from the existing banking platform PCBS on to Cred+.
Account IDs of the cases requiring data transfer will be held on a SQL database. The requirement is that, for each account ID specified on the SQL database, the following data must be read from the PCBS application and input into the Cred+ application:
* Account ID
* Product Type
* Name
* Address
* Date of Birth
* Card PAN (Primary Account Number or credit card number)
* Card Issue Date
* Card Expiry Date
Once the data has been successfully input into Cred+ the correct record on the SQL database will be updated to indicate data transfer is complete. All work queues will be encrypted, however due to the sensitivity of the data, MedBank insist that a single robot account does not have access to both PCBS and CRED+ systems.
The following high level design has been proposed:

Which of the following statements about the solution design are correct? (Choose two.)

  • A. To reduce the elapsed time of the end to end process, the Get Cases process should be run across multiple machines.
  • B. The solution enables multiple instances of the Get PCBS Data and Update Cred+ processes to run without risk of collision.
  • C. If the PCBS application suffers an outage, all Blue Prism processes specified in this design must stop processing immediately.
  • D. There is a risk that the outcome of a data transfer will not be recorded in the SQL database.
  • E. The Process Get PCBS Data should be stopped if the Cred+ application suffers an outage to prevent a backlog of cases in the PCBS Data work queue.
  • F. Such sensitive data should not be stored in a Blue Prism work queue.

Answer: B,E

 

NEW QUESTION 29
Pacific West Banking has a payments process that automatically receives pending payments from multiple regions into their payment system (Paytex).
Paytex contains a queue of cases awaiting payment. When processing the case manually an agent must use two other systems, the core banking system (DataPlus) and online account checker (FireWire).
The manual processing must perform the following steps:
* Open the next case where the status is null in Paytex
* Set the status to "In Progress" in Paytex
* Validate source account in DataPlus
* Confirm source funds in DataPlus
* Check for fraud flags in Paytex
* Confirm recipient IBAN details in Firewire
* Perform payment in Paytex
* Update case in Paytex queue. Add payment confirmation number to case and set status to "Completed"
* Where cases cannot be fulfilled due to validation errors (e.g. invalid account details, insufficient funds, suspected fraud etc.) the customers will be contacted by the agent to resolve.
A proposed Blue Prism solution with the following properties has been created to automate the payment processing:
* There will be one Blue Prism process that will perform the steps described above.
* Where a case is an exception the status will be set in Paytex to "Manual Review" in order that the manual team can pick up the case from Paytex and contact the customer and conclude the case.
* It is anticipated that to meet the SLAs of the expected volumes up to 5 instances of the Blue Prism process will be required to run concurrently.
* A Blue Prism work queue will be used to host the payments. The queue will be configured for only 1 attempt per case and the key will be (region) & {source account number}.
* The process will be started by the scheduler at 06:00 and will stop at 05:50.


Which of the following are correct? (Choose three.)

  • A. There is a risk that a payment can be duplicated.
  • B. The process should not be designed to use a Blue Prism Work Queue but use Paytex as the work queue.
  • C. The solution exposes sensitive personal information.
  • D. There is a risk that a payment can be orphaned.
  • E. The process will not scale i.e. you cannot run multiple instances at the same time.
  • F. The process should not be automated as it uses a third party web application.

Answer: B,C,E

 

NEW QUESTION 30
Which of the following statement combinations about Blue Prism memory management is correct?

  • A. A Blue Prism Process holds a Business Object in memory for the duration of its run.A Blue Prism Process reads a Sub Process into memory as required. Once the called Sub Process is complete, the Process releases the memory for the .Net Garbage Collector to reclaim.
  • B. A Blue Prism Process holds a Sub Process in memory for the duration of its run.A Blue Prism Process holds a Business Object in memory for the duration of its run.
  • C. A Blue Prism Process reads a Business Object into memory as required. Once the called Action is complete, the Process releases the memory for the .Net Garbage Collector to reclaim.A Blue Prism Process reads a Sub Process into memory as required. Once the called Sub Process is complete, the Process releases the memory for the .Net Garbage Collector to reclaim.
  • D. A Blue Prism Process holds a Business Object into memory as required.Once the called Action is complete, the Process releases the memory for the .Net Garbage Collector to reclaim.

Answer: C

 

NEW QUESTION 31
MedBank have recently introduced a new Credit Card platform Cred+. There is a requirement to migrate account and card details from the existing banking platform PCBS on to Cred+.
Account IDs of the cases requiring data transfer will be held on a SQL database. The requirement is that, for each account ID specified on the SQL database, the following data must be read from the PCBS application and input into the Cred+ application:
* Account ID
* Product Type
* Name
* Address
* Date of Birth
* Card PAN (Primary Account Number or credit card number)
* Card Issue Date
* Card Expiry Date
Once the data has been successfully input into Cred+ the correct record on the SQL database will be updated to indicate data transfer is complete. All work queues will be encrypted, however due to the sensitivity of the data, MedBank insist that a single robot account does not have access to both PCBS and CRED+ systems.
The following high level design has been proposed:

Which of the following statements about the solution design are correct? (Choose two.)

  • A. To reduce the elapsed time of the end to end process, the Get Cases process should be run across multiple machines.
  • B. The solution enables multiple instances of the Get PCBS Data and Update Cred+ processes to run without risk of collision.
  • C. If the PCBS application suffers an outage, all Blue Prism processes specified in this design must stop processing immediately.
  • D. There is a risk that the outcome of a data transfer will not be recorded in the SQL database.
  • E. The Process Get PCBS Data should be stopped if the Cred+ application suffers an outage to prevent a backlog of cases in the PCBS Data work queue.
  • F. Such sensitive data should not be stored in a Blue Prism work queue.

Answer: B,E

 

NEW QUESTION 32
A process definition document has been produced for a process that interfaces with two applications: FirstApp and Customer Information (CI). The process requirement is to perform data extraction from FirstApp before performing a number of steps in the CI application.
It is estimated that to perform the daily case volume within SLA's will require 10 robots. Average case time is approximately 10 minutes, with the FirstApp steps requiring only 1 minute to perform.
The client has a limited number of licenses for the FirstApp application and is reluctant to use 10 of these licenses to automate the process.
Which of the below is a valid design option for the project?

  • A. Automate the end to end process using two Blue Prism processes. Process 1 will perform the FirstApp tasks, Process 2 will perform the CI tasks. Data will be passed from Process 1 to Process 2 via a Blue Prism Work Queue. Process 1 will run on a single robot, with Process 2 running on 9 robots.
  • B. Automate the end to end process using single Blue Prism process which will be run on 10 robots.
  • C. Automate the end to end process using two Blue Prism processes. Process 1 will perform the FirstApp tasks, Process 2 will perform the CI tasks. Data will be passed from Process 1 to Process 2 via a spreadsheet. Process 1 will run on a single robot, with Process 2 running on 9 robots.
  • D. Automate the end to end process using single Blue Prism process which will only be run on a single robot.

Answer: C

 

NEW QUESTION 33
SanQuest Bank's call centre regularly receives requests from customers for the exact amount required to clear their loan This is a complicated calculation that is prone to human error. The bank has decided to use Blue Prism to perform the calculation and is considering amending its front end system OneBase to allow a user to click a button to request a Loan Consolidation Amount. They plan to communicate with Blue Prism using web services Consider the two proposed designs:

Here a Blue Prism object is exposed as a web service OneBase calls this service providing the account number The Blue Prism object add the case to a work queue and then returns the Case ID to complete the web service call A Blue Prism process works the queue and harvests the data required to perform the calculation. The same Blue Prism process calls a OneBase web service and provides the loan settlement figure. OneBase completes the web service call by returning a success flag.

Here the Blue Process that harvests the data is exposed a web service with the loan settlement figure as an output. OneBase calls the web service and provides the account number. The Blue Prism process harvests the data and completes the web service call by providing the loan settlement figure.
Considering Blue Prism best practice which of the following statements is correct?

  • A. Neither Design A nor Design B is appropriate
  • B. Design A is the most appropriate option
  • C. Design B is the most appropriate option
  • D. Both Design A and Design B are appropriate

Answer: D

 

NEW QUESTION 34
The following Object Design has been created for a mainframe banking application.

Which of the following statements about the Object design above are correct? (select 2 responses)

  • A. The design complies with Blue Prism design best practice.
  • B. There is no need for attach actions to be replicated across all the objects.
  • C. The object design facilitates a scalable design that will reduce the impact of change when the object layer needs altering
  • D. The Add Note action in the "BankHost - Notepad" business object does not require an input for Type as the process definition document states that Information' will always be selected for this process.
  • E. The object design should be simplified by storing all BankHost actions in the same object

Answer: A,C

 

NEW QUESTION 35
Which of the following statements about using Work Queue designs to split a business process into a multi part robotic solution is correct?
1. Using multiple Work Queues and Processes for the different stages of the business process is a valid design option to split a business process into a multi part robotic solution
2 Using a single Work Queue and deferring cases for future processing is a valid design option to split a business process into a multi part robotic solution
3. Using an item's status to control when to work it is a valid design option to split a business process into a multi part robotic solution
4. You cannot split a business process into a mufti part robotic solution

  • A. 4 only
  • B. 1 and 3
  • C. 1 and 2 Only
  • D. 1, 2 and 3

Answer: D

 

NEW QUESTION 36
You are the Lead Developer tasked with delivering four processes for the same client. You have enough developers in the team to develop all the processes in parallel. All the processes have one application in common, another application is used by two processes and one process uses an application that none of the others do.
Which of the following statements is true?

  • A. Other than the standard utilities, there should be 7 objects.
  • B. Other than the standard utilities, there should be 3 objects.
  • C. Other than the standard utilities, there should be 4 objects.
  • D. It's not possible to determine how many objects there should be.

Answer: A

 

NEW QUESTION 37
Consider the following steps for a theoretical manual process.
* Check in input folder any new files.
* If there are no files check again later as files can arrive anytime, and there is no limit to the number of files that may come.
* Open the next available file.
* Take the first case.
* Start System X and find the case details.
* If the case can't be found, move to the next one.
* After finding the case in System X, fetch additional case details from System Y.
* Again if the case can't be found, move to the next one.
* Analyse all the data to see if System Z should be updated.
* If the data does not meet the requirements, add notes indicating this to System X and Y and move to the next case.
* If the data does meet the requirements, update the case in System Z.
* Add notes to System X and Y and move to the next case.
* At the end of the file, go back and look for another.
* Stop checking for new files at 16:00 and finish any remaining cases.
* When all work is complete create a report of the day's exception cases.
* Close down Systems X, Y and Z.
It is imperative that notes are applied to System X and Y, regardless of whether System Z is updated or not, what could the process do? (Choose two.)

  • A. Add all notes before attempting to update System Z.
  • B. Add notes before rejecting a case as a Business Exception.
  • C. Create an unhappy path where notes are added as part of exception handling.
  • D. Create new cases for any cases not found in Systems X and Y so that notes can be added.

Answer: A,D

 

NEW QUESTION 38
A process is required for a client in the banking sector that involves using an application to transfer funds between accounts. A strong security model is in place to prevent any malicious activity but the client is nervous about the risk of external problems, like a power cut leaving a case in an incomplete state or a fault in the source data causing a case to be duplicated or an excessively large transfer to be made.
What should be included in the solution design? (Choose three.)

  • A. A requirement that the solution is never run on more than one machine.
  • B. A different queue for each major processing step.
  • C. A single queue that is cleared of all worked items at the start of each day.
  • D. A key value that will uniquely identify queue items.
  • E. An exception handling procedure to track manual referrals.
  • F. A different process for each major processing step.
  • G. Rules to limit transaction values.

Answer: D,F,G

 

NEW QUESTION 39
Imagine you are designing the application integration logic for a solution. One of the applications involved is one you have not automated before but it is widely used and the project is the first in a series for this client.
Which of the following are valid considerations when designing business objects? (Choose two.)

  • A. It's best that objects are designed to be reusable and are not made bespoke for one process.
  • B. The first Production process to automate an application should not share its integration logic with any other because there will invariably be teething problems during an initial implementation.
  • C. Any new application should be assessed to find the appropriate integration technique and identify any potential technical issues.
  • D. When an application is automated for the first time a single business object should be used to isolate the first process from any that follow.
  • E. It's best that each process uses its own business objects to keep it separate from any other.

Answer: A,B

 

NEW QUESTION 40
......

Authentic Best resources for ASD01 Online Practice Exam: https://www.braindumpquiz.com/ASD01-exam-material.html