NEW QUESTION 12
Scenario 1:
A network administrator is tasked with enabling SO-WAN at three branch locations. A topology has been provided for reference. For each site, the administrator is having issues bringing edges online, as another administrator has gone ahead and created a configuration ahead of time. The organization has several branch sites. One is an Internet-only site and two are Hybrid locations with both internet and MPLS. The last location is MPLS only. There are hub data center locations in this environment as well. Please refer to the topology.
After the network administrator has determined the problem with the Edge not being able to access the Internet, the administrator receives another error stating that the SD-WAN Orchestrator is still not reachable.
The VCO's address is Amer-vcoOl.velocloud.net.
Refer to the Exhibit(s).

What might be disallowing the Edge to communicate with the Orchestrator?
- A. The SD-WAN Orchestrator has a limited 60-second window for the Edge to come online.
- B. The local firewall that the Edge uses to reach externally is blocking UDP Port 53 in both directions.
- C. The SD-WAN Orchestrator specified is incorrect, and a new activation email needs to be sent.
- D. The SD-WAN Orchestrator is not being resolved for DNS.
Answer: A
NEW QUESTION 13
Scenario 2:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.
Several reports have come in from branch locations indicating customers cannot reach applications being served by the hub location. The hub location has a single LAN-side port from which it should be learning dynamic routes for the subnets serving the applications.
How should the technician verify if the ports on the Edge are up and working?
- A. Look in Test&Troubleshoot under the Remote Diagnostics and run Interface status.
- B. Look in Test&Troubleshoot under the Remote Diagnostics and run System Health.
- C. Look under Administration and System Settings to verify if the interfaces are configured and enabled.
- D. Look in Test&Troubleshoot under the Remote Actions and run System Health.
Answer: C
NEW QUESTION 14
Scenario 3:
After resolving numerous connectivity Issues throughout the various branch sites, connectivity between applications and users is finally present. The network administrator is informed that during certain tests, applications are not performing as they are expected to. Users report that call quality has not fully improved and that some of their calls either drop or have poor voice quality where the conversation is breaking up. Other users are noticing that file transfers are slower than expect. A group of users from a few sites have reported slowness in accessing internal and external applications.
Exhibit.
Users at a remote office are complaining about poor performance with certain applications. The network administrator has already verified the configuration is correct.
Which two parameters should the administrator review to troubleshoot this issue? (Choose two.)
- A. Check the flows to verify which Business Policy the traffic of interest is matching
- B. Change the bandwidth measurement under WAN Overlay Advanced Settings
- C. Check the underlay network (bandwidth, latency, jitter, packet loss)
- D. Look under Monitor, check Business priority tab
Answer: C,D
NEW QUESTION 15
Scenario 1:
A network administrator is tasked! with enabling SO-WAN at three branch locations. A topology has been provided for reference. For each site, the administrator is having issues bringing edges online, as another administrator has gone ahead and created a configuration ahead of time. The organization has several branch sites- One is an Internet-only site and two are Hybrid locations with both internet and MPLS: The last location is MPLS only. There are hub data center locations in this environment as well. Please refer to the topology.
Exhibit.
An administrator is attempting to activate two Edge devices at the Chicago branch location. The local technician reports that the Edge devices are not coming online. The Edge devices have been plugged in, powered on, and connected to the correct circuits with an Enhanced HA setup.
What should the local technician check first when troubleshooting the issue?
- A. Verify the link light sequence of the HA ports.
- B. Verify beep sequence of the Edge devices.
- C. Review the Orchestrator for HA misconfiguration issues.
- D. Review color of the LED.
Answer: A
NEW QUESTION 16
Scenario 2:
After resolving numerous connectivity Issues throughout the various branch sites, connectivity between applications and users is finally present. The network administrator is informed that during certain tests, applications are not performing as they are expected to. Users report that call quality has not fully improved and that some of their calls either drop or have poor voice quality where the conversation is breaking up. Other users are noticing that file transfers are slower than expect. A group of users from a few sites have reported slowness in accessing internal and external applications.
Exhibit.
A network administrator has configured a Business Policy to send a specific application directly out an underlay interface. Users have complained of slow responses for that application. While troubleshooting, the network administrator finds the traffic is actually taking an overlay path to another SD-WAN Edge.
What is causing this behavior?
- A. uI has been configured forcing traffic into the underlay towards the hub.
- B. Internet Backha.
- C. The underlay path is not available forcing traffic into the overlay.
- D. Configuring Business Policy Direct settings have no affect on traffic flows.
- E. The other Edge location is advertising a secure route for the application's subnet.
Answer: A
NEW QUESTION 17
Scenario 2:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.
The tunnel from spoke to hub is not coming up. What are the two possible reasons? (Choose two.)
- A. Dynamic Branch to Branch is not enabled.
- B. Hub WAN Interface might be behind the NAT Device or firewall.
- C. Spoke Edge and hub Edge are two different Edge models.
- D. Spoke Edge and hub Edge have a mismatch certificate authentication mode.
Answer: B,D
NEW QUESTION 18
Scenario:1
A network administrator is tasked with enabling SD-WAN at three branch locations, A topology has been provided for reference. For each site, the administrator is having issues bringing edges online, as another administrator has gone ahead and created a configuration ahead of time. The organization has several branch sites. One is an Internet-only site and two are Hybrid locations with both internet and MPLS. The last location is MPLS only. There are hub data center in this environment as well. Please refer to the topology.
Exhibit.
One of the Edges at the Chicago site is unable to activate. The Edge has a red LED. What is the next troubleshooting step?
- A. If the Edge is connected to the MPLS circuit which does not have DHCP, determine if there is a static IP configuration that needs to be applied upon activation.
- B. If the Edge is connected to the MPLS circuit, determine if the Hub is advertising gateway routes.
- C. If the Edge is connected to its HA peer, determine if there is a link-light on the HA peer-link.
- D. If the Edge is connected to its HA peer, determine if underlay BGP peering is present between the two Edges.
Answer: B
NEW QUESTION 19
Scenario 2:
After completing the branch activation activities for ail required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and blanches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.
After deploying the Edge, the security team has determined that traffic from Guest wireless traffic is able to reach resources in the Production network. There should be absolutely no interaction.
How can this be prevented?
- A. Segmentation is currently not supported on VeloCloud Edge.
- B. Have Guest wireless and Production traffic in the same segment but different VLANs.
- C. Create an additional segment for Guest wireless traffic and leave the Production traffic in the default global segment.
- D. Create two subnets, one for Guest wireless traffic and another one for Production traffic.
Answer: A
NEW QUESTION 20
Scenario 2:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.
A network administrator is investigating connectivity issues between Chicago and San Jose. The administrator browses to the Overlay Flow Control (OFC) window and notices that the screen is blank with no routes shown in the OFC.
What is a possible reason for this?
- A. The routing table on the Edges has not been initialized.
- B. There is an invalid MTU configuration at Chicago.
- C. Cloud VPN for the Edges / Profiles is not enabled.
- D. OSPF or BGP is not enabled.
Answer: C
NEW QUESTION 21
Scenario 2:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.
A network administrator decides to deploy a local Checkpoint VNF appliance on the Edge in London to cut back on unnecessary traffic towards the NY Hub location. While attempting to deploy the VNF, the process keeps failing.
Where can the administrator check to see more detail?
- A. VCO > Monitor > Logging
- B. VCO > Test & Troubleshoot > Remote Actions > Alerts
- C. VCO > Monitor > Events
- D. VCO > Test & Troubleshoot > Remote Diagnostics > Events
Answer: A
NEW QUESTION 22
Scenario 1:
A network administrator is tasked with enabling SD-WAN at three branch locations. A topology has been provided for reference. For each site, the administrator is having issues bringing edges online, as another administrator has gone ahead and created a configuration ahead of lime. The organization has several branch sites. One is an Internet-only site and two are Hybrid locations with both internet and MPLS. The last location is MPLS only. There are hub data center locations in this environment as well. Please refer to the topology.
Exhibit.
When attempting to activate an Edge, after clicking on the "activation link" in the email that was sent to the network administrator, the Edge's local UI shows as "Internet down". This is preventing the Edge from coming online and being activated. When referring to the output, the network administrator notices that the Edge has received DHCP addressing.
What could be preventing the Edge from coming online?
- A. Cloud VPN is not enabled in the AMER Branch profile.
- B. The next hop does not respond to ICMP pings.
- C. The Edge's profile does not specify the correct Edge Model.
- D. The subnet mask assigned to the Edge is incorrect.
Answer: C
NEW QUESTION 23
Scenario 3:
After resolving numerous connectivity issues throughout the various branch sites, connectivity between applications and users is finally present. The network administrator is informed that during certain tests, applications are not performing as they are expected lo. Users report that call quality has not fully improved and that some of their calls either drop or have poor voice quality where the conversation is breaking up. Other users are noticing that file transfers are slower than expect. A group of users from a few sites have reported slowness in accessing internal and external applications.
Exhibit.
Users are complaining that web pages to certain web sites are very slow to load and at times unresponsive. The network administrator has verified that the traffic is going correctly out the underlay.
What should the administrator check next?
- A. Verify the Business Policy flows are matching.
- B. Verify if Path-MTU Discovery is disabled.
- C. Verify if routes to Gateways are present in the Overlay Flow Control (OFC).
- D. Verify if there is latency, loss, or jitter on the underlay.
Answer: B
NEW QUESTION 24
Scenario 2:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.
A network administrator has received an email from the applications development team requesting connectivity to their AWS VPC.
The administrator has configured the tunnel via the VMware SD-WAN Gateway. The tunnel status icon has not turned green.
Where are two places the administrator must check? (Choose two.)
- A. Determine if the PSK is mismatched between the AWS side and the VeloCloud Edge.
- B. Determine if the NVS has been enabled and assigned to a profile.
- C. Determine if the PSK is mismatched between the AWS side and the VeloCloud Gateway.
- D. Determine if the DH parameter on the Edge has been configured.
Answer: A,C
NEW QUESTION 25
Scenario 1:
The Dallas Branch location is having issues getting activated. The local network administrator is aware that the Edge device received a DHCP address and was able to connect to the internet. The Orchestrator is reporting the Edge as Down. No other changes were made post activation.
A network administrator is tasked with enabling SD-WAN at three branch locations. A topology has been provided for reference. For each site, the administrator is having issues bringing edges online, as another administrator has gone ahead and created a configuration ahead of time. The organization has several branch sites. One is am Internet-only site and two are Hybrid locations with both internet and MPLS. The last location is MPLS only. There are hub data center locations in this environment as well. Please refer to the topology.
Refer to the Exhibit(s).

What is the cause of this issue?
- A. The activation link did not contain any post-activation configuration to allow the Orchestrator to communicate with the Edge.
- B. The activation link contained incorrect configurations for WAN overlays and WAN interfaces.
- C. The activation link did not specify the updated image location requiring the Edge to be re-activated.
- D. The Edge will be offline for about 4 hours until it has completed the factory image installation.
Answer: C