In addition to the exam, candidates must meet certain eligibility requirements before they can apply for the certification. These requirements include a minimum of five years of experience in physical security or a related field, as well as a clean criminal record. Candidates who meet the eligibility requirements and pass the exam are awarded the PSP certification, which is valid for three years.

 

NEW QUESTION # 82
The system which provides an extra measure of security by requiring that exchanges take place at the entrance to each restricted area within the controlled area is called:

  • A. Contractive pass system
  • B. Multiple-pass system
  • C. Pass-exchange system
  • D. Single pass system

Answer: B


NEW QUESTION # 83
A set of unwanted instructions executed on a computer and resulting in a variety of effects is called:

  • A. All of the above
  • B. Bug
  • C. Virus
  • D. Worm

Answer: C


NEW QUESTION # 84
Which of the following is NOT of the basic trends of security services?

  • A. Attract better qualified individuals
  • B. Regulate training and standards
  • C. Disarm security personnel
  • D. All of the above

Answer: D


NEW QUESTION # 85
What occurs when the person who committed the act was able to foresee that the action would result in certain damages?

  • A. Active resister
  • B. Lack of control
  • C. International tort
  • D. None of the above

Answer: C


NEW QUESTION # 86
Which of the following is NOT the organizational level of international terrorism?

  • A. State terrorism
  • B. Modern terrorism
  • C. Group terrorism
  • D. Individual terrorism

Answer: B


NEW QUESTION # 87
The common practices in recruiting a jihadist are:

  • A. training and preparation for the terrorist act
  • B. indoctrination
  • C. All of the above
  • D. identifying individuals with appropriate ideology

Answer: C


NEW QUESTION # 88
Which of the following risks CANNOT be estimated by BILCO with only a resource-loaded schedule?

  • A. Delay due to SDOT's other projects
  • B. Cost overruns due to cement shortage
  • C. Liquidated damages on the SDOT contract
  • D. Delay due to labor shortage

Answer: A

Explanation:
Understanding the Problem:
* The question asks which risk cannot be estimated using only a resource-loaded schedule.
* A resource-loaded schedule contains detailed information about activities, resources (labor, materials, equipment), and their associated costs but does not provide external information unrelated to project resources.
Analysis of Each Option:
* A. Delay due to SDOT's other projects:
* This risk depends on external factors beyond the control or visibility of the resource-loaded schedule, such as project interactions, priorities, or resource allocation managed by SDOT (the State Department of Transportation).
* A resource-loaded schedule cannot estimate this delay, as it does not account for external dependencies or priorities outside the project's scope.
* This is the correct answer.
* B. Delay due to labor shortage:
* A resource-loaded schedule tracks labor availability and allocation. By analyzing resource constraints, it can estimate potential delays due to labor shortages.
* This risk can be estimated using the schedule.
* C. Liquidated damages on the SDOT contract:
* Liquidated damages are linked to project delays. A resource-loaded schedule can estimate the delay impact and calculate potential damages based on contract terms.
* This risk can be estimated.
* D. Cost overruns due to cement shortage:
* Cement shortages directly affect the material resource allocations in the schedule. A resource- loaded schedule can estimate cost overruns by analyzing material usage and constraints.
* This risk can be estimated.
Final Answer and Justification:
* Option A is correct because a resource-loaded schedule cannot consider or predict delays caused by external projects managed by other entities like SDOT.
* All other risks relate to project resources or scheduling, which can be analyzed using a resource-loaded schedule.
Study Guide Reference:
* Refer to the PSP Certification Study Guide, Chapter 2 - Scheduling, sections on Schedule Maintenance and Risk Analysis (p. 209), and Resource-Constrained Scheduling (p. 163).
* AACE Recommended Practice 57R-09: "Integrated Cost and Schedule Risk Analysis" provides additional insights into risks measurable through schedules.


NEW QUESTION # 89
All the following describe the critical path of a schedule EXCEPT:

  • A. Frequently defined as the shortest path through the schedule.
  • B. Changed by redefining the network logic or changing activity durations or both.
  • C. The series of activities having the least amount of total float.
  • D. Determined by network logic and is the chain of activities that controls the overall project completion time.

Answer: A

Explanation:
Critical Path Characteristics:
* The critical path is the longest path through the network, defining the minimum project completion time. It cannot be the shortest path.
PSP Study Guide References:
* Critical path analysis emphasizes that it is determined by network logic and represents the chain of activities controlling the project duration.
Analysis for Selection:
* Option A, C, and D: Accurately describe the critical path.
* Option B: Incorrect; the critical path is not the shortest path.
Conclusion: The correct answer is B, as the critical path is the longest path, not the shortest.


NEW QUESTION # 90
Which of the following are NOT considerations or constraints of the planning process for construction scheduling?

  • A. Consideration of all stakeholders.
  • B. Project variables.
  • C. Value engineering.
  • D. Interest rate of owner's construction bonds.

Answer: D


NEW QUESTION # 91
Determine the correct formula and date for the late start for the Activity 11001:

  • A. LF of 11001 less 25 days plus 1 day equaling 16 Jan 2024
  • B. LF of 11001 less 27 days plus 1 day equaling 14 Jan 2024
  • C. LF of 1000 less 25 days equaling 16 Jan 2024
  • D. LF of 11001 less duration of 11001 equaling 16 Jan 2024

Answer: D

Explanation:
Late Start Formula:
* Late Start (LS) is calculated as LF#DurationLF - \text{Duration}LF#Duration.
* For Activity 11001: LF#25=16Jan2024LF - 25 = 16 Jan 2024LF#25=16Jan2024.
Cross-Verification with PSP Guidelines:This formula aligns with the PSP methodology for backward pass calculations, where late start is directly computed from late finish and duration values (Ref: PSP Study Guide, Chapter 2A: Schedule Analysis).


NEW QUESTION # 92
What focus on legal principles and theories along with cases in which such principles predominate?

  • A. Legal document
  • B. Formal memorandum
  • C. Encyclopedias
  • D. None of the above

Answer: C


NEW QUESTION # 93
Document the events, circumstances, and chronology and prepare a "lesson learned" review are the primary parts of:

  • A. After action
  • B. Quality assurance
  • C. All of the above
  • D. Testing

Answer: A


NEW QUESTION # 94
The systems that utilized in communities that have a municipal alarm system are called:

  • A. Main system
  • B. Alert system
  • C. Warning system
  • D. Auxiliary system

Answer: D


NEW QUESTION # 95
In its simplest form, what is the main drawback of critical path method scheduling?

  • A. It doesn't account for interdependent between activities.
  • B. It requires a backward pass to calculate late dates.
  • C. It assumes that resources are unlimited.
  • D. It allows for Precedence Diagramming Method to be used in place of Arrow Diagramming Method.

Answer: C

Explanation:
A fundamental limitation of Critical Path Method (CPM) scheduling is its assumption of unlimited resources, meaning it does not account for resource constraints when calculating schedules.
* Option A (backward pass) is a standard part of the CPM process.
* Option C is incorrect as CPM considers activity dependencies.
* Option D refers to flexibility in diagramming methods, not a drawback.
The PSP Study Guide highlights resource constraints as a significant challenge in CPM application.


NEW QUESTION # 96
An offense punishable by death or by imprisonment for a term exceeding one year is called:

  • A. Felony
  • B. Corruption
  • C. Misdemeanor
  • D. Misguidance

Answer: A


NEW QUESTION # 97
Which of the following is NOT the category of signaling systems?

  • A. Global
  • B. Remote station
  • C. Central station
  • D. Auxiliary

Answer: A


NEW QUESTION # 98
What is the free float for Activity F?

  • A. 3 months.
  • B. 2month.
  • C. 0months.
  • D. 1months.

Answer: B

Explanation:
Understand Free Float:Free float is the time an activity can be delayed without delaying the start of its immediate successor.
Review Activity F in the Diagram:
* Activity F has a successor that starts later, providing room for 2 months of free float.
Cross-Verification:
* Option A: Incorrect. Overestimates the float.
* Option B: Incorrect. No float is incorrect for F.
* Option C: Incorrect. 1 month is insufficient.
* Option D: Correct. Matches the calculated free float for Activity F.


NEW QUESTION # 99
The classic triangle frequently referred to in describing the nature of fire consists of:

  • A. heat, light, oxygen
  • B. heat, smoke, oxygen
  • C. heat, carbon dioxide, oxygen
  • D. heat, fuel, oxygen

Answer: D


NEW QUESTION # 100
What is the result of a forward pass calculation?

  • A. Early start and early finish date for individual activities
  • B. Value of free float for individual activities
  • C. Critical path
  • D. Value of total float for individual activities

Answer: A

Explanation:
Scheduling Professional Study Guide and Documents References
* Forward Pass Calculation:
* A forward pass determines the earliest start (ES) and earliest finish (EF) dates for all activities, progressing from project start to finish.
* Total float is calculated later by comparing early and late dates.
* PSP Study Guide References:
* Forward and backward pass calculations are core elements of CPM scheduling methodology.
* Conclusion: The correct answer is B, as forward pass provides ES and EF for activities.


NEW QUESTION # 101
The degree to which a manager or supervisor is able to delegate responsibility rather than trying to do everything personally is a good measure of managerial ability.

  • A. False
  • B. True

Answer: B


NEW QUESTION # 102
To use _____________ for the storage of valuables subject to theft, an all too common practice is to invite disaster.

  • A. Control safes
  • B. Fire-resistance safes
  • C. Record safes
  • D. Resistive safes

Answer: B


NEW QUESTION # 103
Which law concerns the rights, duties, and penalties of individuals in their relationship with each other?

  • A. Procedural law
  • B. Statutes suit
  • C. Substantive law
  • D. Constructive law

Answer: C


NEW QUESTION # 104
Which of the following will NOT affect the total float calculation of a non-resource leveled schedule?

  • A. Multiple calendars.
  • B. Front end loading.
  • C. Start and finish constraints.
  • D. Preferential logic.

Answer: B


NEW QUESTION # 105
The relationship between the two groups continues to be strained because of which key issue?

  • A. Moonlight policies for public police
  • B. Provision of services in borderline of responsibility
  • C. All of the above
  • D. Perceived competition

Answer: C


NEW QUESTION # 106
Using the crashed schedule, if you start Activity 2002 on 12 August 2021. what is the finish date for Activity
2002?

  • A. 19 Sep 2021
  • B. 09 Sep 2021
  • C. 27 Aug 2021
  • D. 08 Sep 2021

Answer: B

Explanation:
Activity 2002 in the Crashed Schedule:
* Activity 2002 duration in the crashed schedule is 28 days.
* Start Date: 12 August 2021.
* Finish Date = Start Date + Duration (excluding non-working days).
Calculation:
* 12 August + 28 days = 09 September 2021 (excluding weekends or non-working days based on typical calendars).
Verification with PSP Guidelines:Accurate calculation of start and finish dates aligns with scheduling best practices (Ref: PSP Study Guide, Chapter 2A: Schedule Development).


NEW QUESTION # 107
......


ASIS PSP Exam is a highly respected certification program that recognizes the expertise of security professionals who specialize in physical security. PSP exam covers a wide range of topics and requires candidates to demonstrate their knowledge of both theoretical concepts and practical applications. If you are interested in pursuing a career in physical security or advancing your current security credentials, the ASIS PSP Exam is an excellent way to enhance your professional standing and demonstrate your expertise in the field.

 