
2024 E-S4HCON2023 Dumps PDF - E-S4HCON2023 Real Exam Questions Answers
Valid E-S4HCON2023 Test Answers & SAP E-S4HCON2023 Exam PDF
NEW QUESTION # 33
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
- A. Activation of dictionary objects (ACT_UPG)
- B. Switch to new repository (EU_SWITCH)
- C. Conversion of application tables (PARCONV_UPG)
- D. Modification adjustment (SPDD)
Answer: A,D
NEW QUESTION # 34
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. SAP Solution Manager 7.2
- B. SAP S/4HANA Server 1809 and above
- C. SAP ECC system from SAP ERP 6.0 EHP 8
- D. Standalone AS ABAP with SAP_BASIS 752 and above
Answer: B,D
NEW QUESTION # 35
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
- A. It contains a troubleshooting section
- B. It is a database-specific document
- C. It contains a section "free space requirements"
- D. It is target release specific
Answer: C,D
NEW QUESTION # 36
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?
- A. Before the start of the SUM technical downtime
- B. During the SUM technical downtime
- C. After SUM has ended
- D. During the Execution roadmap step
Answer: B
NEW QUESTION # 37
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
- A. Using the database migration option (DMO) for SUM
- B. Using the main configuration option "Single System" in case of an upgrade.
- C. Using the main configuration option "Single System" when installing an Add-On
- D. Using the main configuration option "Standard" when applying SAP Support Packages
Answer: C
NEW QUESTION # 38
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
- A. An SAP S4HANA 1709 sandbox system
- B. AA
- C. A Standalone SAP system with ABAP 7.51 or above
Answer: A,C
NEW QUESTION # 39
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.
- A. Download it from SAP Support Portal
- B. Configure it within transaction ATC
- C. Generate it by analyzing the specific custom code via RFC
- D. Apply the corresponding SAP note via SAP Note Assistant
Answer: A
NEW QUESTION # 40
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.
- A. It explains the database migration option (DMO) of SUM.
- B. It explains where to find information about the custom code analysis.
- C. It contains a section about the simplification item (SI) checks.
- D. It is a database-specific document.
Answer: B,C
NEW QUESTION # 41
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?
- A. The repetition option allows you to repeat the complete migration
- B. The benchmaking option allows you to repeat the uptime migration
- C. The benchmaking option allows you to migration a specified set of tables
- D. The repetition option allows you to run the migration without a shadow system
Answer: C
NEW QUESTION # 42
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:
- A. Execution of XPRAs and AIMs
- B. Execution of SPDD modification adjustment
- C. Execution of SPAU modification adjustment
- D. Creation of the table structures in the new SAP HANA database
- E. Execution of eCATTs for business validation tests
Answer: A,C,E
NEW QUESTION # 43
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?
- A. The SAP support packages in the download directory that are newer than the selected support package stack
- B. The SAP support packages of the support package stack, calculated by the maintenance planner
- C. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
- D. The SAP support packages that will be bound to the conversion
Answer: A
NEW QUESTION # 44
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
- A. Downtime Optimized Data Conversion (DoC)
- B. Near-Zero Downtime Technology (NZDT)
- C. Near-Zero Downtime Maintenance (nZDM)
- D. Downtime Optimized DMO (DoDMO)
Answer: B
NEW QUESTION # 45
You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.
- A. Modification adjustment (SPAU)
- B. Activation of dictionary objects (ACT_UPG)
- C. Conversion of application tables (PARCONV_UPG)
- D. Modification adjustment (SPDD)
Answer: B,D
NEW QUESTION # 46
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
- A. Kernel for target release, Windows, SAP MaxDB
- B. Kernel for target release, Windows, SAP HANA
- C. Kernel for target release, Linux, SAP HANA
- D. Kernel for source release, Windows, SAP MaxDB
Answer: B,D
NEW QUESTION # 47
You are executing a standard SUM procedure to update an SAP system using main configuration mode
"Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. At the end of the downtime
- B. Early in the downtime
- C. As part of the cleanup process
- D. Before the downtime starts
Answer: D
NEW QUESTION # 48
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:
- A. /ASU/START (Start ASU Toolbox)
- B. /ASU/SSM (ASU Simple Schedule Manager)
- C. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
- D. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
Answer: A
NEW QUESTION # 49
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
- A. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
- B. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
- C. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
- D. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
Answer: D
NEW QUESTION # 50
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correctanswers to this question.
Response:
- A. Check the dump size of the database export on disk
- B. Check logs for jobs starting with "RSUPG_SGEN" in the system
- C. Check the "Charts Control Center" in the SUM UI
- D. Check the log files written under "SUM\abap\log"
Answer: C,D
NEW QUESTION # 51
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
- A. The SAP Support Packages found in the download directory
- B. The SAP Support Packages contained in the upgrade media
- C. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
- D. The SAP Support Packages that will be bound to the upgrade
Answer: A
NEW QUESTION # 52
......
E-S4HCON2023 Exam Dumps - PDF Questions and Testing Engine: https://www.braindumpquiz.com/E-S4HCON2023-exam-material.html
Realistic E-S4HCON2023 Exam Dumps with Accurate & Updated Questions: https://drive.google.com/open?id=1BUtJeIdx4Y0xFGdyfVikUEC85ofYu9fc