NEW QUESTION 337
The material requirement plan authorizes production activity control (PAC):

  • A. All of these
  • B. To take control of work orders and make sure they are completed on time
  • C. To manage day-to-day activity and provide the necessary support
  • D. To work orders to the shop for manufacturing

Answer: A

 

NEW QUESTION 338
The probability of rejecting a good lot is called the consumer's risk.

  • A. false
  • B. True

Answer: A

 

NEW QUESTION 339
Using non-cumulative methods, what is the ATP in period 1?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B

 

NEW QUESTION 340
Which of the following is an advantage of VMI?

  • A. MRP system operating costs decrease
  • B. The customer can usually force additional concessions from the VMI supplier
  • C. Suppliers can leverage better information to reduce inventory levels.
  • D. Lead-times are increased

Answer: C

 

NEW QUESTION 341
For a particular commodity, the line-haul cost is $2.50 per mile. For a trip of 500 miles and a shipment of 600 cwt., what is the cost of shipping cwt.? If this shipment is increased to 1000 cwt., what is the saving in cost per cwt.?

  • A. $ 1.25 and $0.85
  • B. $ 1.25 and $0.83
  • C. $ $ 1.27 and $0.90
  • D. $ 1.29 and $0.80

Answer: B

 

NEW QUESTION 342
Inventory must be sorted and the same parts collected together so they can easily be counted, this is called:

  • A. Housekeeping
  • B. Recording
  • C. Bookkeeping
  • D. Recordkeeping

Answer: A

 

NEW QUESTION 343
If demand shifts between models, the assembly line can respond daily, this is called:

  • A. mixed-model scheduling
  • B. Shifting scheduling
  • C. variable-model scheduling
  • D. miscellaneous scheduling

Answer: A

 

NEW QUESTION 344
Which of eth following is NOT the source of waste in the design of the manufacturing system?

  • A. Process
  • B. Environment
  • C. Movement
  • D. Methods

Answer: B

 

NEW QUESTION 345
Following is an example of:

  • A. Lead time schedule
  • B. Wait time schedule
  • C. Shop calendar
  • D. Routing file

Answer: C

 

NEW QUESTION 346
Showing the scope of the quality management system is known as:

  • A. procedure
  • B. practice
  • C. plan
  • D. policy

Answer: D

 

NEW QUESTION 347
In s distribution system, which activity affects customer service and the cost of providing it?

  • A. Distribution inventory
  • B. All of the above
  • C. Order processing and communication
  • D. Warehouses

Answer: B

 

NEW QUESTION 348
Benefit/s of supply chain simulation is/are:

  • A. To be able to capture system dynamics: using probability distribution, user can model unexpected events in certain areas and understand the impact of these events on the supply chain
  • B. All of these
  • C. To minimize the risk of changes in planning process: by what-if simulation, user can test various alternatives before changing plan.
  • D. To help understand the overall supply chain processes and characteristics by graphics/animation

Answer: B

 

NEW QUESTION 349
What was/were the conflict/s in traditional system before the growth of supply chain concept?

  • A. Costly distribution systems were these
  • B. Strategy of high inventory pile up was following
  • C. Often departmental objectives were maximized without considering the effect they would have on other parts of the system.
  • D. Supply, production and distribution system were organized into separate functions that reported to different departments of a company.

Answer: C,D

 

NEW QUESTION 350
What is the updated forecast, utilizing exponential smoothing, given the following data?
Old Forecast = 100, actual demand = 80, alpha = 0.2, tracking signal = 0.9

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 351
Capacity needs to be measured on at which of the following level?

  • A. All of the above
  • B. Work center
  • C. Machine or individual worker
  • D. Plant, which can be considered as a group of different work centers

Answer: A

 

NEW QUESTION 352
The files contained in the database are of two types which are:

  • A. absolute and relative
  • B. fixed and variable
  • C. planning and procedural
  • D. planning and control

Answer: D

 

NEW QUESTION 353
Identify the problem, generate ideas about main causes of problem, brainstorm all possible causes for each main cause and try to identify the most likely root cause are all the steps of:

  • A. Schematic of a process
  • B. Component diagram
  • C. Cause-and-effect diagram
  • D. Pareto diagram

Answer: C

 

NEW QUESTION 354
Stockout cost money for which of the following reason?

  • A. All of the above
  • B. Lost customers
  • C. Lost costs
  • D. Back-order costs

Answer: A

 

NEW QUESTION 355
......