BICSI RCDDv15 Exam Overview:
| Certification Vendor: | BICSI |
|---|---|
| Exam Name: | BICSI Registered Communications Distribution Designer (RCDD) v15 Exam |
| Exam Number: | RCDD v15 |
| Available Languages: | English |
| Exam Format: | Computer-based exam (CBT), Multiple-choice questions |
| Certificate Validity Period: | 3 years (renewal required via continuing education credits) |
| Recommended Training: | BICSI Official Training Courses |
| Exam Registration: | BICSI RCDD Certification Page |
| Sample Questions: | BICSI RCDDv15 Sample Questions |
| Exam Way: | Proctored computer-based exam (CBT), delivered at authorized testing centers or online proctoring where available. |
| Pre Condition: | BICSI recommends candidates have significant ICT/telecommunications design experience (commonly around 5 years) before applying for RCDD qualification. |
| Official Syllabus URL: | https://www.bicsi.org/certifications/rcdd |
BICSI RCDDv15 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Topic 1: Cabling Infrastructure | - Performance and topology considerations - Copper and fiber optic systems design |
| Topic 2: Project Management and Documentation | - Coordination with stakeholders and contractors - Design documentation and deliverables |
| Topic 3: Telecommunications Industry Standards and Compliance | - Industry best practices and updates - Regulatory compliance and safety standards |
| Topic 4: Pathways and Spaces | - Cable pathways and infrastructure layout - Telecommunications spaces design (TR, ER, entrance facilities) |
| Topic 5: Telecommunications Distribution Design Principles | - Design methodologies and requirements - Standards and codes (ANSI/TIA, ISO/IEC, BICSI best practices) |
| Topic 6: Grounding, Bonding and Electrical Protection | - Surge protection and bonding practices - Telecommunications grounding systems |
BICSI Registered Communications Distribution Designer - RCDD v15 Sample Questions:
A company is releasing a new product geared toward a specific geographic area. The program manager has received the program objectives and developed the program roadmap which consists of six program components Approval from the program governance board has been obtained.
What is the program manager's next step?
- A. Identify the program sponsor and program stakeholders
- B. Assign project managers and resources
- C. Develop the program business case
- D. Classify the program's benefits
Correct Answer: A 🗳️
When designing cable tray pathways under an access floor, what is the MINIMUM free space that should exist between the top of the cable tray side rails and the underside of the stringers?
- A. 51 mm (2 in)
- B. 101.60 mm (4 in)
- C. 25 mm (1 in)
- D. 71 mm (3 in)
Correct Answer: C 🗳️
An R&D group director approves a major program's charter although the director has a high level of understanding of the program's scope (hoy are unsure of how the program manager can be successful in delivering the program's commitments
What should the program manager do to align stakeholders with planning and monitoring the program's progress?
- A. Establish high-level program milestones
- B. Create a communications management plan, and establish reporting formats
- C. Generate a supplier management plan to identify external stakeholders
- D. Develop an accountability matrix, and assign program roles and responsibilities
Correct Answer: B 🗳️
A request for proposal (RFP) yields a bid with a better delivery schedule and a lower cost, but originates from a vendor not on the prequalified vendor list During the final review of the RFPs the program manager is informed that the new bidder is a relative of the project manager. Although the bid meets all company policies, the program manager is concerned about a conflict of interest.
What should the program manager do?
- A. Add the new vendor to the prequalified list and replace the project manager
- B. Advise the sponsor of a possible conflict of interest prior to awarding the bid
- C. Accept the bid from the new vendor and document the decision.
- D. Select the best bid from the prequalified vendor list
Correct Answer: B 🗳️
What is a simplified cone of protection for lightning strikes as it pertains to a structure (building, pole, etc.)?
- A. 43 m (140 ft)
- B. A base radius equal to the height of the structure
- C. 50% of the height of the structure in any direction
- D. A base diameter equal to the height of the structure
Correct Answer: B 🗳️
We're so confident of our products that we provide no hassle product exchange.


By Ira