Nutanix Certified Master - Multicloud Infrastructure (NCM-MCI) Sample Questions:
1. Task 9
The application team has requested several mission-critical VMs to be configured for disaster recovery. The remote site (when added) will not be managed by Prism Central. As such, this solution should be built using the Web Console.
Disaster Recovery requirements per VM:
Mkt01
RPO: 2 hours
Retention: 5 snapshots
Fin01
RPO: 15 minutes
Retention: 7 days
Dev01
RPO: 1 day
Retention: 2 snapshots
Configure a DR solution that meets the stated requirements.
Any objects created in this item must start with the name of the VM being protected.
Note: the remote site will be added later
2. Task 12
The application team is reporting performance degradation for a business-critical application that runs processes all day on Saturdays.
The team is requesting monitoring or processor, memory and storage utilization for the three VMs that make up the database cluster for the application: ORA01, ORA02 and ORA03.
The report should contain tables for the following:
At the cluster level, only for the current cluster:
The maximum percentage of CPU used
At the VM level, including any future VM with the prefix ORA:
The maximum time taken to process I/O Read requests
The Maximum percentage of time a VM waits to use physical CPU, out of the local CPU time allotted to the VM.
The report should run on Sundays at 12:00 AM for the previous 24 hours. The report should be emailed to [email protected] when competed.
Create a report named Weekends that meets these requirements
Note: You must name the report Weekends to receive any credit. Any other objects needed can be named as you see fit. SMTP is not configured.
3. An administrator needs to perform AOS and AHV upgrades on a Nutanix cluster and wants to ensure that VM data is replicated as quickly as possible when hosts and CVMs are rebooted.
Configure Cluster 1 so that after planned host and CVM reboots, the rebuild scan starts immediately.
Note:
You will need to use SSH for this task. Ignore the fact that this is a 1-node cluster.
4. An administrator regularly sees a WARN for backup_schedule_check and also receives alerts for Pulse not being enabled on Cluster 1.
Detailed information for backup_schedule_check:
Node xx.xx.xx.xx:
WARN: Backup schedule(s) exist for protection domain NoVMs; however, there are no entities in the protection domain.
Refer
to KB 1910 (http://portal.nutanix.com/kb/1910) for details on backup_schedule_check or Recheck with: ncc health_checks data_protection_checks protection_domain_checks backup_schedule_check.
This shows up in NCC, however, it is something set up by the company and they do not want the NCC check to be run.
Configure Cluster 1 to no longer have messages in NCC about the backup_schedule_check.
Turn off the alert for Pulse not being enabled, and resolve the alert. They would like messages about Pulse to be recorded, but do not want an alert.
Note: You may need to run the "Pulse is not enabled" check in order to have one to resolve.
Solutions:
| Question # 1 Answer: Only visible for members | Question # 2 Answer: Only visible for members | Question # 3 Answer: Only visible for members | Question # 4 Answer: Only visible for members |
We're so confident of our products that we provide no hassle product exchange.


By Isabel

