Huawei HCSP-Presales-Campus Network Planning and Design V1.0 Sample Questions:
1. What advanced features can OceanStor Pacific's unstructured data services share? (Multiple choice)
A) Snapshot
B) Unified metadata index
C) Authentication
D) Qos
2. OceanStor Dorado NAS log audit supports operation log audit and management log audit. What is the granularity of log audit? (Multiple choice)
A) vStore-level business operations audit
B) Device-Level Management Operations Audit
C) Tenant-level management operations audit
D) Device level business operations audit
3. Before installing the AC, please take anti-static protection measures, such as wearing anti-static gloves or anti-static wrist strap.
A) False
B) True
4. In QOS design, the incorrect description of traffic scheduling design principles is:
A) The currently planned QoS strategy needs to consider the subsequent expansion of the network.
B) The scheduling strategy of the entire network should maintain the principle of unity, and try to use templated deployment to facilitate network management.
C) For TCP-based services, the queue must be configured with WRED discarding to avoid TCP global synchronization.
D) Core services and video and voice services must ensure the absolute priority of forwarding and use PQ scheduling.
E) Unless the business has special needs, try to use default values for some parameters of the scheduling policy.
F) LPQ/WFQ scheduling strategy can be used to prevent low-priority services from being unable to obtain bandwidth resources.
5. Which of the following descriptions about CloudCampus is incorrect?
A) It is supported to complete network topology planning on iMaster NCE first, and then the device goes online. Topology error correction is not supported during this process.
B) When a user creates a site on iMaster NCE and adds devices to the site, the system supports adding devices one by one and importing devices in batches.
C) After the device goes online on iMaster NCE, iMaster NCE can automatically discover the network's physical topology.
D) Support the device to go online first, and then the user can complete the network planning on iMaster NCE.
Solutions:
| Question # 1 Answer: A,B,D | Question # 2 Answer: A,B | Question # 3 Answer: B | Question # 4 Answer: F | Question # 5 Answer: A |
We're so confident of our products that we provide no hassle product exchange.


By Mildred

