AMPP Senior-Internal-Corrosion-Technologist Exam Overview:
| Certification Vendor: | AMPP (Association for Materials Protection and Performance) |
|---|---|
| Exam Name: | AMPP Internal Corrosion for Pipelines - Level 2 Senior Internal Corrosion Technologist Exam |
| Exam Number: | ICP-Level-2 / Senior Internal Corrosion Technologist |
| Passing Score: | Varies (typically AMPP uses scaled scoring or pass/fail threshold defined per exam version) |
| Exam Price: | Varies by region and AMPP member status (typically USD-based pricing set by AMPP) |
| Available Languages: | English |
| Exam Format: | Multiple-choice, Scenario-based questions |
| Related Certifications: | Senior Internal Corrosion Technologist (Level 2) Internal Corrosion Specialist (Level 3) Internal Corrosion Technologist (Level 1) |
| Real Exam Qty: | Varies (commonly 60–120 range depending on exam version) |
| Exam Duration: | Varies by delivery method (typically 120–180 minutes) |
| Certificate Validity Period: | 5 years (subject to AMPP certification maintenance requirements) |
| Recommended Training: | AMPP Internal Corrosion Training Courses |
| Exam Registration: | AMPP Certification Registration |
| Sample Questions: | AMPP Senior-Internal-Corrosion-Technologist Sample Questions |
| Exam Way: | Computer-based exam delivered via AMPP testing centers or online proctored format (depending on region and availability) |
| Pre Condition: | AMPP recommends completion of Internal Corrosion Technologist (Level 1) or equivalent industry experience in pipeline corrosion management. |
| Official Syllabus URL: | https://www.ampp.org/certification |
AMPP Senior-Internal-Corrosion-Technologist Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Internal Corrosion Fundamentals | - Corrosion mechanisms in internal pipeline environments - Thermodynamics and kinetics of corrosion reactions - Electrochemical corrosion principles in pipeline systems |
| Corrosion Mitigation and Control | - Pigging operations for internal corrosion control - Chemical inhibition programs and selection - Operational controls (flow rate, dehydration, treatment) |
| Integrity Management and Risk Assessment | - Risk-based inspection and integrity management planning - Internal corrosion threat assessment methodologies - Data interpretation for corrosion growth prediction |
| Corrosion Monitoring and Detection | - Inline inspection and intelligent pigging methods - Corrosion coupons and electrical resistance probes - Sampling and water chemistry analysis techniques |
| Internal Corrosion Threats in Pipelines | - Produced water and aqueous phase corrosion - Microbiologically Influenced Corrosion (MIC) - CO2 (sweet corrosion) and H2S (sour corrosion) |
AMPP Internal Corrosion for Pipelines - Level 2 Sample Questions:
Eddy current DFT gauges are used to measure Dry Film Thickness in which of the following situations:
- A. Magnetic coatings applied to a magnetic metallic substrate
- B. Conductive coatings applied to a magnetic metallic substrate
- C. Conductive coatings applied to a cementitious substrate
- D. Non-Conductive coatings applied to a conductive metallic substrate
Correct Answer: C 🗳️
Application of Thermal Spray Coatings requires:
- A. No particular skills
- B. The same skills as liquid coatings
- C. Specialized skills supported by training and experience
- D. The same skills as welding
Correct Answer: C 🗳️
All of these ate advantages of using repair patches EXCEPT
- A. excellent abrasion resistance.
- B. inert to common acids, alkalis, and solvents.
- C. barrier to moisture and corrosion.
- D. special tools or equipment are required.
Correct Answer: D 🗳️
When using a destructive Paint Inspection Gauge the NACE inspector must:
- A. Select the appropriate hand wheel based on the measured Dry Film Thickness prior to use
- B. Consult SSPC Guide 1 prior to use
- C. Ensure the glue on the dolly is properly applied prior to use
- D. Determine the Dry Film Thickness of the coating prior to use
Correct Answer: A 🗳️
You are a NACE Level 2 Coaling Inspector who has Just arrived on a Jobin progress where there Is no Inspection and Test Plan (UP). The first morning you arrive the Job is behind schedule and you are asked to take Dry Rim Thickness readings.
Your FIRST preferred course of action is to:
- A. Develop your own methodology and proceed take the readings
- B. Call your supervisor
- C. Use a generally accepted industry standard and proceed to take readings
- D. Refuseto take readings until an ITP isin place
Correct Answer: D 🗳️
Viewing page 1 out of 21 pages.
Viewing questions 1-5 out of 102 questions.
We're so confident of our products that we provide no hassle product exchange.


By Liz

