BICSI DCDC-002 Exam Overview:
| Certification Vendor: | BICSI |
|---|---|
| Exam Name: | BICSI Data Center Design Consultant (DCDC) Exam |
| Exam Number: | DCDC-002 |
| Related Certifications: | CDCDP (Certified Data Centre Design Professional) RCDD (Registered Communications Distribution Designer) |
| Available Languages: | English |
| Exam Format: | Multiple-choice |
| Recommended Training: | BICSI Official Training Programs |
| Exam Registration: | BICSI Certification Registration |
| Sample Questions: | BICSI DCDC-002 Sample Questions |
| Exam Way: | Computer-based exam (delivery method may vary by testing center) |
| Pre Condition: | Recommended: experience in data center design or BICSI-related certifications such as RCDD |
| Official Syllabus URL: | https://www.bicsi.org |
BICSI DCDC-002 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Topic 1: Resiliency, Risk, and Standards | - Uptime and redundancy tiers - Industry standards and compliance frameworks |
| Topic 2: Electrical Systems Design | - UPS and backup power systems - Power distribution and redundancy |
| Topic 3: Data Center Planning and Design Fundamentals | - Design objectives and performance criteria - Requirements analysis and stakeholder coordination |
| Topic 4: Mechanical and Cooling Systems | - HVAC design principles for data centers - Thermal management and airflow design |
| Topic 5: Telecommunications and Cabling Infrastructure | - Structured cabling systems - Standards compliance (TIA/BICSI best practices) |
| Topic 6: Site Selection and Facility Considerations | - Location risks and environmental factors - Building structure and space planning |
BICSI Data Center Design Consultant - DCDC Sample Questions:
What is the clearance required between cabinets and the perimeter wall?
- A. 2 ft
- B. 6 ft
- C. 4 ft
- D. 8 ft
Correct Answer: C 🗳️
What are three primary considerations in designing the power systems space plan?
- A. Energy utilization, efficiency of cooling and redundant generators
- B. Reduce transmission loss, conduit path minimizing & spacing requirement for system
- C. Physical security, environmental monitoring, backup power source
- D. Leakage current control, firewall protection & hardening redundancy
Correct Answer: B 🗳️
What is the NEBS GR-3028-CORE recommended operational temperature.
- A. -25°F to +125°F (-32°C to +52°C)
- B. -30°F to +110°F (-34°C to +43°C)
- C. Up To140 Degrees Fahrenheit /60 Degrees Celsius
- D. -20°F/-28° C minimum and up to a maximum of104 ° Fahrenheit/40° Celsius
Correct Answer: D 🗳️
What is the switch gear in an electrical distribution design responsible for?
- A. Managing cooling systems
- B. Transferring control between utility and generator
- C. Delivering power directly to the server racks
- D. Transforming voltage
Correct Answer: B 🗳️
Where is the recommended location for remote power panels?
- A. outside the building
- B. at one or both ends of an equipment row
- C. inside a sealed room
- D. suspended from ceiling
Correct Answer: B 🗳️