IBM C4070-604 Exam Overview:
| Certification Vendor: | IBM |
| Exam Name: | IBM System z Technical V5 |
| Exam Number: | 000-604 |
| Related Certifications: | IBM System z Technical IBM z/OS certifications |
| Exam Duration: | 90-120 |
| Available Languages: | English |
| Exam Format: | Multiple choice, Single-answer questions, Scenario-based questions |
| Recommended Training: | IBM Training - System z / z/OS courses |
| Exam Registration: | IBM Certification Portal |
| Sample Questions: | IBM C4070-604 Sample Questions |
| Exam Way: | Computer-based testing at authorized test centers or online proctored exam (varies by region and IBM testing provider) |
| Pre Condition: | No strict prerequisites; basic knowledge of IBM mainframe or z/OS systems recommended. |
| Official Syllabus URL: | https://www.ibm.com/certify |
IBM C4070-604 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| System Operations and Management | - System monitoring and performance - Problem determination basics - Console operations |
| Security and Access Control | - System security configuration - User authentication and authorization - RACF fundamentals |
| z/OS Operating System Fundamentals | - System initialization and shutdown - z/OS structure and components - Job control and workload processing |
| IBM System z Architecture Overview | - Mainframe hardware components - Processor and memory concepts - z/Architecture principles |
| Storage and Data Management | - VSAM and dataset organization - Storage management subsystems - DASD and tape storage concepts |
IBM System z Technical V5 Sample Questions:
1. A System z customer has a new CIO. The CIO is concerned about continuous operations and recovery following a site catastrophe. Which of the following addresses this issue?
A) CBU
B) Parallel Sysplex
C) GDPS
D) DR
2. Which of the following tools provides a financial analysis for a distributed server consolidation on System z opportunity at no cost to the customer?
A) RACEv
B) PRA
C) BVWA
D) SCON
3. Which of the following planning considerations for zBX environments is least critical compared with the others?
A) Review z/OS LPAR weight settings on all CPCs attached to the zBX.
B) Inform datacenter management and major application analysts on new HMC workload management functions.
C) Involve customer network access and security management in system design and planning.
D) Review interaction and SLA expectations among SCP-host and blade applications and components.
4. A customer is planning a large consolidation project of multiple System z servers and numerous distributed servers. Which method is appropriate to perform a capacity planning and a TCO analysis for the consolidation?
A) RACEv tool to perform an in depth analysis of the environment
B) Scorpion study to perform an in depth analysis of the environment
C) Rule of thumb (ten x86 processors = 1 IFL, 3 Power CPUs = 1IFL)
D) Commercial benchmark results to estimate the hardware capacity and the BVAT for the TCO
5. A zEnterprise customer is considering consolidating multiple CPCs. What basic technical factors should be included when performing a CEC consolidation analysis?
A) Involve customer application and datacenter managers on their views about personnel relocation.
B) Integrate all SCP LPAR definitions and CEC weights, then consider possible elimination or integration options.
C) Ask if SOA is included in Application Development methodology futures.
D) Discuss implications of IPv6 on capacity requirements
Solutions:
| Question # 1 Answer: C | Question # 2 Answer: A | Question # 3 Answer: A | Question # 4 Answer: B | Question # 5 Answer: B |