Microsoft 070-499 Exam Overview:
| Certification Vendor: | Microsoft |
|---|---|
| Exam Name: | Recertification for MCSD: Application Lifecycle Management |
| Exam Number: | 70-499 |
| Exam Price: | USD 165 (varies by region) |
| Exam Duration: | 120 minutes |
| Exam Format: | Scenario-based questions, Multiple choice, Drag and drop, Case studies |
| Related Certifications: | MCSD: Application Lifecycle Management |
| Real Exam Qty: | 40-60 (approximate) |
| Passing Score: | 700 (scaled score out of 1000) |
| Certificate Validity Period: | Recertification required periodically (typically 2 years); exam is now retired |
| Available Languages: | English |
| Recommended Training: | Microsoft Learn (ALM and Azure DevOps learning paths) Azure DevOps Documentation |
| Exam Registration: | Pearson VUE Microsoft Exams Microsoft Certification Dashboard (Registration) |
| Sample Questions: | Microsoft 070-499 Sample Questions |
| Exam Way: | Online proctored or authorized testing center (Pearson VUE) |
| Pre Condition: | Candidates are typically expected to already hold MCSD: Application Lifecycle Management certification. |
| Official Syllabus URL: | https://learn.microsoft.com/en-us/credentials/certifications/ |
Microsoft 070-499 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Source Control and Code Management | - Version control systems
|
| Testing and Quality Assurance | - Test management in ALM tools
|
| Application Monitoring and Maintenance | - Operational monitoring
|
| Build and Release Management | - Release pipelines
|
| Application Lifecycle Management Overview | - Team Foundation Server / Azure DevOps fundamentals
|
Microsoft Recertification for MCSD: Application Lifecycle Management Sample Questions:
DRAG DROP
You are developing a new application that contains complicated validation and transformation logic on data pulled from three separate source systems.
You need to get feedback from your stakeholders to verify that your application meets their requirements before any other development tasks have been started. You also need to ensure that this application sub-system is correct before any other dependent module can be developed.
What should you do? (To answer, move the five appropriate actions from the list of actions to the answer area and arrange them in the correct order.)
Correct Answer:

You are using Microsoft Test Manager (MTM).
You have been assigned to work on a test case for an application that is still in development. There have been changes to the test case.
You need to know what changes have been made.
What should you do?
- A. Open the test case work item, click the Summary tab, and click All changes.
- B. View the automatic collected change document on the Attachments tab.
- C. Add a link to a test change document from the test plan properties.
- D. Open the test case work item, click on Links, then view links of the linked type Versioned Item.
Correct Answer: A 🗳️
You have an existing deployment of Microsoft Visual Studio Team Foundation Server (TFS). The application tier and data tier are on separate dedicated servers.
You need to provide redundancy to the application tier and increase performance.
Which two actions should you perform? Each correct answer presents part of the solution.
- A. Set up a SQL Server failover cluster.
- B. Set up Network Load Balancing.
- C. Install an additional application-tier server.
- D. Ensure that the application tier and configuration database are on the same server.
Correct Answer: B,C 🗳️
Explanation: Only visible for BraindumpQuiz members. You can sign-up / login (it's free).
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
You need to be able to trace bugs to the code that addresses the bug.
What should you do?
- A. Enable the Work Items check-in policy. In the Edit options of the policy, select the Active Bugs query.
- B. Enable the Work Items check-in policy and request that all developers associate the work item to the appropriate bug at the time of check-in.
- C. Enable the Work Items check-in policy. In the Edit options of the policy, select Bug from the list of work item types.
- D. Enable the Changeset Comments check-in policy.
Correct Answer: B 🗳️
You are part of a scrum team that is trying to identify user stories to complete in the next
sprint.
You and the team need to select user stories for the next sprint.
What should you do?
- A. Have the product owner decide which user stories to complete within the sprint.
- B. Have the team decide which user stories to complete within the sprint.
- C. Order the user stories by their story points. Select the top stories based on the team's velocity.
- D. Have the scrum master decide which user stories to complete within the sprint.
Correct Answer: B 🗳️
Explanation: Only visible for BraindumpQuiz members. You can sign-up / login (it's free).
Viewing page 1 out of 59 pages.
Viewing questions 1-5 out of 292 questions.
We're so confident of our products that we provide no hassle product exchange.


By Amanda